STEP 3 (See Diagram 3)
A.) Attach the Sliding Weight Post (#15) to the Sliding Frame (#8). Secure it with two M8 x 1 3/8” Carriage Bolts (#44), two Ø 5/8” Washers (#53), and two M8 Aircraft Nut (#55). Make sure the triangular cable connecting bracket faces up.
B.) Attach one 128” Cable (#24) to the front opening on Upper Frame (#6).
C.) Attach a Pulley (#39) to the opening. Secure it with M10 x 3 ¾” Allen Bolt (#46), two Ø ¾” Washer (#52), and one M10 Aircraft Nut (#54).
D.) Draw the Cable over the Pulley toward the back of the machine. Make Sure the ball stopper on Cable is underneath the Frame.
E.) Draw the Cable to the second opening on the Upper Fame. Repeat B to install a Pulley. F.) Draw the Cable around the Pulley and then downward. Attach a Pulley to the two Double Floating Pulley Brackets (#25). Secure the Pulley to the top hole on the Brackets with one
M10 x 1 ¾” Allen Bolt (#48), two Ø 3/4” Washers (#52), and one M10 Aircraft Nut (#54). G.)Draw the Cable around the Pulley then upward to the opening on the rear of Upper Frame.
Let the Brackets hanging for now.
H.) Repeat B to install another Pulley. Draw the Cable around the Pulley then downward through the two Guide Rods (#13) to the triangular bracket on the Sliding Weight Post.
I.) Secure the end of Cable to the bracket with one M10 X ¾” Allen Bolt (#50), two Ø ¾” Washers (#52), and one M10 Aircraft Nut (#54).
J.) Connect the Lat Bar (#26) to the Cable with two Hooks (#56) and one
10