11. | Attach a Fly Arm (25) to an Upright (1) with an | 11 |
|
|
|
|
|
| M10 x 120mm Bolt (19) and an M10 Nylon |
|
|
|
|
| |
| Locknut (33). Make sure that the Fly Arm is on |
| 25 |
|
|
|
|
| the outside of the Fly Arm Stop (15). Do not |
|
|
|
| 33 | |
| overtighten the Nylon Locknut; the Fly Arm |
|
|
|
| 1 | |
| must pivot easily. |
|
|
|
|
| |
| Attach the other Fly Arm (25) in the same way. |
|
|
|
| 15 |
|
|
|
| 19 |
| 25 |
| |
|
|
|
|
|
| ||
|
|
|
|
|
|
| |
12. | Insert an Arm Pad Tube (12) into the indicated | 12 |
|
|
| 12 |
|
| hole in a Fly Arm (25) from the side shown. Next, |
| 25 |
|
| ||
| slide a Foam Pad (23) onto the Arm Pad Tube; |
|
|
|
|
| |
| the Foam Pad will hold the Arm Pad Tube in |
|
|
|
|
|
|
| place. |
|
|
|
|
|
|
| Repeat this step with the other Fly Arm (not |
| 23 |
|
|
|
|
| shown). |
|
|
|
|
| |
13. | Insert the Inner Bar (43) into the Outer Bar (40) | 13 |
|
|
|
|
|
| and align the indicated holes. Using a hammer, |
|
|
|
|
| |
| tap the two Roll Pins (41) into the holes until they |
|
|
|
|
|
|
| are flush with the Outer Bar. |
|
| 41 | Holes | 43 |
|
|
|
|
|
| |||
|
|
| 40 |
| Holes |
| |
|
|
|
| 41 |
| ||
|
|
|
|
|
|
| |
14. | Attach the Curl Pad (45) to the Curl Post (27) with | 14 |
|
|
|
|
|
| two M6 x 16mm Screws (29). |
|
|
|
|
| |
|
|
| 45 |
|
| 29 |
|
|
|
|
|
|
|
| |
15. | Make sure that all parts are properly tightened |
|
|
| 27 |
|
|
| before the weight bench is used. The use of all |
|
|
|
|
|
|
| remaining parts will be explained in ADJUST- |
|
|
|
|
|
|
| MENT, starting on page 10. | 9 |
|
|
|
|
|
|
|
|
|
|
|
|