GE PFDS450EL_GL, PFDS455GLWW Special Installation Requirements Stacked Installation

Page 2

PFDS450GL/PFDS455GL

GE Profile 7.5 cu. ft. stainless steel capacity frontload dryer with Steam

Special Installation Requirements:

Stacked Installation:

• Brackets for stacking dryer over washer are available at an additional cost.

Custom built-in white installation template:

• Order Pub. No. 14-A025.

Alcove or Closet Installation:

If your dryer is approved for installation in an alcove or closet, it will be stated on a label on the dryer back.

The dryer MUST be exhausted to the outside.

Minimum clearances between dryer cabinet and adjacent walls or other surfaces are: 0" either side, 3" front and rear

Minimum vertical space from floor to overhead cabinets, ceilings, etc. is 52".

Closet doors must be louvered or otherwise ventilated and must contain a minimum of 60 sq. in. of open area equally distributed. If this closet contains both a washer and a dryer, doors must contain a minimum of 120 sq. in. of open area equally distributed.

No other fuel-burning appliance shall be installed in the same closet with a gas dryer.

Bathroom or Bedroom Installation:

The dryer MUST be exhausted to the outdoors.

The installation must conform with the local codes, or in the absence of

local codes, with the National Electric Code and National Fuel Gas Code, ANSI Z223 for gas dryers.

Minimum Clearance other than Alcove or Closet Installations:

• Minimum clearances to combustible surfaces 0" both sides, 3" rear.

For more information on venting kits and accessories, please call 1-800-GE-CARES.

For answers to your Monogram,® GE Profileor GE® appliance questions, visit our website at ge.com or call GE Answer Center® service, 800.626.2000.

Stacked Dimensions (in inches)

79 1/2"

Storage Pedestal Dimensions (in inches)

SPSD157JMG - Champagne SPSD157JWW - White

This optional 15" pedestal raises the door opening and height of the washer or dryer. Feet on 15" pedestal allow it to adjust to 15- 3/8" height.

2729-1/2

15

Specification Revised 10/10

270184

Image 2
Contents 120V Dimensions and Installation Information in inchesSpecification Revised 10/10 LP Conversion Kit WE25M46Alcove or Closet Installation Special Installation Requirements Stacked InstallationCustom built-in white installation template Bathroom or Bedroom InstallationDryer Exhausting Information Metal Duct Only Exhaust Length CalculationFeatures and Benefits