Upper Juntion Box, Top Auger Motor Conduit, & Operator Light
Top auger motor conduit.
Upper junction box.
1 |
|
|
|
|
3 | 4 |
| 5 | 6 |
Operator light. |
|
| Fill switch assembly (installed). | |
|
| 7 | 9 | 12 |
|
|
|
| |
2 |
|
| 10 |
|
|
|
|
| |
9 |
| 1 | 11 |
|
|
|
| ||
|
| 2 |
|
|
|
|
|
| 15 |
11 | 10 | 1 | 2 | 8 |
Fill switch assembly (opened).
13
14
Items 9 - 14 are components of the mercury switch box assembly (fill switch assembly) part no.
9
ITEM No. | DESCRIPTION | PART No. |
|
|
|
1 | CONDUIT 1/2" EMT METALLIC | |
2 | CONNECTOR 1/2" EMT COMPRESSION | |
3 | CLAMP 1/2" CONDUIT | |
4 | CONNECTOR 1/2" EMT TO SEALTITE | |
5 | SEALTITE PVC 1/2" | |
6 | ELBOW 1/2" 90 DEGREE PVC WITH | |
7 | LAMP 90 DEGREE W/JUNC.BOX | |
8 | BULB, 100W 130V ROUGH SERVICE | |
9 | ENCLOSURE 4x4x2.5 WHITE PVC | |
10 | CONNECTOR 1/2" | |
11 | WIRE 18/2 TYPE | |
12 | MOUNTING PLATE WLDMNT, MERC.BX | |
13 | MERCURY SWITCH | |
14 | CLIP MERCURY SWITCH | |
15 | MERCURY SWITCH SHAFT |
54 |
|