American Dryer Corp
ML-95
manual
Front Panel/Main Door Assemblies, As of October 24
Control Door Assembly
Main Door Switch
Page 8
6
Front Panel/Main Door Assemblies
As of October 24, 1997
American Dryer Corporation
88 Currant Road / Fall River, MA
02720-4781
Page 7
Page 9
Image 8
Page 7
Page 9
Contents
ML-95 Parts Manual
American Dryer Corporation
Retain This Manual In a Safe Place For Future Reference
Table of Contents
Control Door Assembly
Phase 6 Microprocessor Panel Assembly
As of February 11
Prior to February 11
Sensor Bracket Assembly
Front Panel/Main Door Assemblies
As of October 24
Front Panel/Main Door Assemblies
Prior to October 24
Front Panel/Main Door Assemblies
Main Door Switch
Main Door Switch
Lint Door Assembly
Lint Door Assembly
Basket Tumbler Assembly
Front Thruster Wheel Assembly
Between September 15, 1997 and April 6
Prior to September 15
Rear Thruster Wheel Assembly
Rear Thruster Wheel Assembly
As of April 6
As of April 6
Idler Shaft Assembly
As of December 15
Prior to December 15
Drive Shaft Assembly
Drive Shaft Assembly
Drive Motor Assembly
Blower Fan/Impellor Motor Assembly
Sail Switch Assembly
As of July 1
Blower Fan/Impellor Wheel Assembly with Air Jet
Blower Fan/Impellor Wheel Assembly without Air Jet
Prior to July 1
Blower Fan/Impellor Wheel Assembly without Air Jet
Burner Assembly
Burner Assembly
Reversing Relay Panel Assembly
For 208/230/240/380/416 Volt Models only
Reversing Relay Panel Assembly
For 460/480 Volt Models only
Transition Piece Assembly with Damper
As of September 12
Exhaust Adapter Assembly
Prior to September 12
Pneumatic Valve Assembly
Related pages
How do I reset a Lochinvar lockout condition?
Discover the steps here
(/path-to-page)
Top
Page
Image
Contents