Mercury Marine 899183001 manual Operation, Floorboard Installation

Page 26

OPERATION

Floorboard Installation

NOTE: The floorboards must be installed into the boat before the boat is inflated.

NOTE: Each H channel should be installed with the larger flat side facing up. Assemble floorboards with the printed identifying number facing up.

b

a

1

c

2

3

4

b

c

18129

Four board models

a - H channel Short c - H channel Long b - Side joiner

22

Image 26
Contents Warranty Message Sport 240, 270, 310HIN Table of Contents Repairs Warranty Registration United States and Canada Warranty InformationTransfer of Warranty What is Covered Duration of Coverage What Mercury will doHOW to Obtain Warranty Coverage What is not CoveredWarranty Information Before Operating Your Boat General InformationBoaters Responsibilities Lanyard Stop Switch General Information Protecting People In The Water While YOU are CruisingWave And Wake Jumping While Boat is StationaryImpact With Underwater Hazards Exhaust Emissions Be Alert to Carbon Monoxide PoisoningGood Ventilation Poor VentilationSafe Boating Suggestions While Boat is MovingSpecifications PVC Manufacturers Plate Wind Force and Wave HeightISO 6185 Part Categories Back View Boat Components Components Location Front ViewTransom View Side ViewTransporting Trailering BoatFloorboard Installation OperationFive board models Slide the rear floorboard No or 5 under the transom retainer 10139 Inflating Assembly Outboard Power Pre‑Operating Check ListOperation Slide Drain Valve Operation Drain Valve OperationLoading Plug Drain Valve OperationBeaching TowingAir Chamber Deflates Accidently Deflating MaintenanceCleaning Procedure Folding Instructions 18168 Repairs Air Chamber Repair ‑ PVC FabricONE Part Glue Emergency Repairs only TWO Part AdhesiveStorage Storage PreparationParts And Accessories Inquiries Owners Service AssistanceService Assistance Service Away From Home