Mercury Marine 899846001 manual Repairs

Page 48

REPAIRS

Apply three thin layers of adhesive with a short bristle brush, in a circular pattern on both the backside of the patch and the patch area on the boat. Allow each layer to dry for 5‑10 minutes before applying the next layer. After applying the third layer, wait 5‑10 minutes and then apply the patch to the prepared area and press down firmly. Using a smooth object (a back of a tablespoon works well), force out any air bubbles that may have been trapped under the patch, working from the center of the patch to the outside.

After removing the masking tape, place a 4‑5 pound weight onto the patch and allow 24 hours drying time before pressurizing the repaired air chamber.

44

Image 48
Contents Warranty Message Heavy Duty 380, 430HIN Table of Contents Cleaning Procedure Deflating Folding Instructions Warranty Information Transfer of WarrantyWarranty Registration United States and Canada What is Covered Duration of Coverage What Mercury will doHOW to Obtain Warranty Coverage What is not CoveredDisclaimers and Limitations General Information Boaters ResponsibilitiesBefore Operating Your Boat Lanyard Stop Switch General Information Protecting People In The Water While YOU are CruisingWave And Wake Jumping While Boat is StationaryImpact With Underwater Hazards Exhaust Emissions Be Alert to Carbon Monoxide PoisoningGood Ventilation Poor VentilationSafe Boating Suggestions While Boat is MovingGeneral Information Specifications Models with PVC FabricModels with Hypalon Fabric 530Manufacturers Plate Wind Force and Wave HeightPowered Boat Rating Boat Components Component Location ‑ PVC ModelsBack View Front ViewTransom View Side ViewComponent Location ‑ Hypalon Models Model 380 shown Transporting Trailering BoatFloorboard Installation Models with Wood Floors OperationSlide the rear floorboard No.5 under the transom retainer. b Side joiners Floorboard Installation Models with Aluminium Floors Six board model Slide the rear floorboard under the transom retainers. b 24122 Inflating Closed position Valve capOverpressure Security Valve ‑ Hypalon Models Outboard Power Pre‑Operating Check ListLoading Drain Valve Operation Slide Drain Valve OperationPlug Drain Valve Operation Towing Air Chamber Deflates AccidentlyBeaching Maintenance Cleaning ProcedureDeflating Folding Instructions 23508 Repairs Air Chamber Repair ‑ Hypalon FabricAir Chamber Repair ‑ PVC Fabric ONE Part Glue Emergency Repairs onlyTWO Part Adhesive Repairs Repairs Storage Storage PreparationOwners Service Assistance Service AssistanceParts And Accessories Inquiries Service Away From Home