Grizzly T10458 instruction manual Installing Purfling, To install the purfling

Page 9

10.Glue and clamp the tail block to the sides, as shown in Figure 6.

Figure 6. Clamping and gluing the tail block in

place.

Installing Purfling

The sound board comes pre-cut with a 532" dado around the sound hole for decorating. The purfling material includes one mahogany strip and six strips of plastic. It is supplied long and will need to be arranged, measured, and cut. Arrange the purfling as desired to customize the ukulele. Select a purfling pattern that suits you. Figure 7 shows an example.

Figure 7. Purfling arranged with end-cut at 45°.

Note: This kit includes a wood strip of purfling. At least 2 bands of the plastic purfling need to be on the outside edge of the purfling pattern to ensure that the wood piece will not splinter as it is bent around the sound hole.

We recommend soaking the wood strip for at least an hour before installation. This will help the wood bend as it is installed.

To install the purfling:

1.Clamp the purfling strips together and cut one end of the group at a 45° angle. Do this as close to one end of the strip as possible (see

Figure 7).

2.Trial fit the purfling in the dado by tapping it in gently with a non-marring mallet, as shown in

Figure 8.

Figure 8. Installing the purfling.

3.Match the ends and mark with a pencil. Cut the other end at an opposing 45° angle so the two angles meet smoothly when the purfling is installed.

4.Remove the purfling, add a small amount of glue to the bottom of the dado, and re-install the purfling. Be sure to remove any squeezed- out glue with a damp cloth.

5.Place a weight on the purfling to keep it in place while the glue dries for the manufac- turer's recommended time.

6.Once the glue is dry, sand the purfling flush with surface of the sound board.

Model T10458 (Mfg. Since 10/11)

-7-

Image 9
Contents Soprano Ukulele KIT Page Table of Contents Safety Manual Accuracy IntroductionContact Info IdentificationREF PART# Description QTY Parts InventoryAssembly Supplies/Tools Before StartingRecommended Tools & Supplies To attach the tail and neck block to the sides Assembling Sides BlocksTo install the purfling Installing PurflingTo prepare the sound board braces Attaching BracesTo attach the braces to the back To attach the braces to the sound boardTo attach the bridge plate to the sound board Attaching Kerfing To fit the kerfing to the ukulele sidesTo glue the kerfing to the ukulele sides To attach the back Sound board glued to the body with Rubber bands and wedgesTo attach the frets to the fingerboard Installing FretsTo attach the neck to the body Attaching Neck to Ukulele BodyUkulele Body SandingDetermining Bridge Location Attaching FingerboardTo attach the fingerboard To determine the correct bridge/nut locationPainting/Finishing Preparing to FinishTo attach the bridge to the ukulele Attaching BridgeTo Step To check the string heights at the 1st and 12th Setting String HeightFrets See FigureTo install the tuning peg To install the ukulele strings Installing Tuning Peg Installing StringsTuning Aftermarket AccessoriesModel T24022-The Daily Ukulele Model T24020-Rogers & Hammerstein for ukuleleModel H2532-12 Stainless Steel Ruler Order Hours a DAY