INSTALLATION
Continued
Receptacle |
Blower |
FIELD WIRE | INCOMING | 120V AC (FUSE BOX | OR BREAKER) |
BLK | WHT | GRN | |
| BLK | WHT | RECEPTACLE |
BLOWER
CONNECTORS (NOT SUPPLIED)
|
|
|
|
|
|
|
| 105C |
|
| GND |
|
|
|
|
| |
| GRN VARIABLE SPEED ELECTRICAL RATING: CONTROL 120v, 60Hz, 0.9A | original wire must be replaced, it must be | TEW minimum 16GA copper wire rated at | |||||
| ||||||||
|
|
|
|
|
|
| Note: If any of the | replaced with type |
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
Speed |
|
| |
Control |
|
| |
Shaft |
|
| |
Control | Lock | Hook and Loop | |
Mounting Strips | |||
Knob | Nut | ||
|
Figure 18 - Installing Optional Blower
GA3500A
Heat Deflective Hood installation
The factory supplied heat deflective hoods must be installed inside the fireplace opening on both sides for the safe operation of the unit as shown in Figure 19.
1.Remove protective covering from hoods.
2.Position deflective hood into opening on one side of the firebox and secure to the top of the opening using screws provided.
3.Secure the ends of the hood to the firebox using two screws (provided) for each side.
4.Repeat steps 2 and 3 to install hood on the opposite side of the firebox.
CAUTION: Do not clean hood with abrasive cleanser. Use only regular household cleaners and
Figure 17 - Optional Blower Wiring
Diagram
Operating Optional Blower GA3500A Light your gas appliance with the blower off. After about 10 minutes, turn the blower on to deliver heated air out the top louvers. The blower features a variable control which allows you to select the blower speed you desire.
Note: Periodically check the louvers of the firebox and remove any dust, dirt or obstructions.
a smooth cloth.
Front Hood
(Typical Each Side)
Corner
Post
3 Screws
2 Screws Each (Top)
End of Hood
Figure 19 - Typical Hood Installation
(Both Sides)
14 | www.desatech.com |