Desa (V)K42EP, (V)K42EN Location of Termination CAP, Balcony with Perpendicular Side Wall

Page 6

6

LOCATION OF TERMINATION CAP

LOCATION OF TERMINATION CAP

N

N

D

E V

B L

C

Fixed

 

V

Closed

 

 

 

Openable

 

F V

Openable

B

Fixed

Closed

H

V

B

I

G

B

B

V J X

G

A

M

V

K X

V

G V A

V TERMINATION CAP

X AIR SUPPLY INLET

G

GAS METER

RESTRICTED AREA (TERMINATION PROHIBITED)

A= clearance above grade, veranda, porch, deck, or balcony [*12 inches (30.5mc) minimum]

B= clearance to window or door that may be opened

[12 inches (30.5cm) minimum]

C = clearance to permanently closed window [minimum 12 inches (30.5cm) recommended to prevent condensation on window]

D = vertical clearance to ventilated soffit located above the terminal within a horizontal distance of 24 inches (61cm) from the center-line of the terminal [18 inches (45.7cm) minimum]

E= clearance to unventilated soffit [12 inches (30.5cm) minimum]

F= clearance to outside corner (see below)

G= clearance to inside corner (see below)

H= *not to be installed above a meter/regulator assembly within

36 inches (91.4cm) horizontally from the center-line of the regulator

I= clearance to service regulator vent outlet [*72 inches (182.9cm) minimum]

J= clearance to non-mechanical air supply inlet to building or the combustion air inlet to any other fireplace [*12 inches (30.5cm) minimum]

K= clearance to a mechanical air supply inlet [*72 inches (182.9cm) minimum]

L= clearance above paved side-walk or a paved driveway located on public property [*84 inches (213.3cm) minimum]

M= clearance under veranda, porch, deck [*12 inches (30.5cm) minimum ]

N= clearance above a roof shall extend a minimum of 24 inches (61cm) above the highest point when it passes through the roof surface and any other obstruction within a horizontal distance of 18 inches (45.7cm)

vent shall not terminate directly above a side-walk or paved driveway which is located between two single family dwellings and serves both dwellings*

only permitted if veranda, porch, deck or balconey is fully open on a minimum of 2 sides beneath the floor*

*as specified in CAN/CSA B149 (.1 or .2) Installation Codes (1991) for Canada and U.S.A. Note: Local codes or regulations may require different clearances

Termination Clearances for Buildings with Combustible and Noncombustible Exteriors

Inside Corner

Outside Corner

A

 

 

 

A = 6" (15.2cm)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

V

 

 

 

V

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

B B = 6" (15.2cm)

Recessed Location

D

C

C

E

V

Balcony with No Side Wall

G

V

G = 12" (30.5cm) minimum clearance

Balcony with Perpendicular Side Wall

H

V

J

Combustible &

Noncombustible

H = 24" (61cm)

J = 20" (50.8cm)

C = Maximum depth of 48" (121.9cm) for recessed location

D = Minimum width for back wall of recessed location - Combustible - 38" (965mm) Noncombustible - 24" (61cm)

E = Clearance from corner in recessed location- Combustible - 6" (15.2cm) Noncombustible - 2" (5.1cm)

Figure 7 - Minimum Clearances for Termination Cap

For..com

111922-01A

Image 6
Contents OWNER’S Operation Installation Manual For Your SafetyFor Your Safety What to do if YOU Smell GAS Table of Contents Safety InformationProduct Identification Local CodesProduct Features PRE-INSTALLATION PreparationLocation and Space Requirements Clearances Framing and FinishingLocation of Termination CAP Balcony with Perpendicular Side WallVenting Installation Instructions Installation PrecautionsInstallation Planning Horizontal Termination InstallationInstalling Siding Standoff Combustible Exterior Horizontal Termination Configurations Ground Floor InstallationCorner Installation Venting with Two 90 Elbows Installation for Vertical Termination Flat Ceiling InstallationVertical Termination Configurations High Altitude Installation Number DescriptionModel BK Installation Fireplace InstallationInstalling Optional Blower Accessory Check GAS TypeModel BKT Installation Blower Model BKTInstalling GAS Piping to Fireplace Location Blower Wiring DiagramInstallation Items Needed Connecting Fireplace to GAS SupplyPressure Testing Gas Supply Piping System Checking GAS ConnectionsPressure Testing Fireplace Gas Connections REMOVING/REPLACING Glass DoorRemoving Louver Panels Cleaning Glass Door Removing Glass DoorInstalling LOGS, Lava Rock and Glowing Embers Wall Switch InstallationWiring Diagram Optional Remote ControlLighting Instructions For Your Safety Read Before LightingOperating Fireplace To Turn OFF GAS To ApplianceInspecting Burners Operating Optional Blower AccessoryPilot Assembly Burner Flame PatternPilot and Burners Cleaning MaintenanceGlass Door LogsTroubleshooting Observed Problem Possible Cause RemedyGas leak. See Warning statement at Technical Service Replacement PartsService Hints SpecificationsIllustrated Parts Breakdown ModelsParts List VK42N, VK42NH, VK42P, VK42PHBurner Assembly for Models VK42EN, VK42ENH, VK42EP, VK42EPH Burner Assembly for Models VK42N, VK42NH, VK42P, VK42PH Accessories Owners Registration Form Postage Required 111922-01A Warranty Information