Desa CDCFNR installation manual Connecting to GAS Supply, Sediment Trap

Page 16

INSTALLATION

Continued

CONNECTING TO GAS SUPPLY

WARNING: This appliance requires a 45° male flare fitting 5/8"-18 UNF (Unified National Fine Thread) inlet connection and the flexible gas line provided.

WARNING: A qualified service person must connect fireplace to gas supply. Follow all local codes.

WARNING:Neverconnectnatu- ralgasfireplacetoprivate(non-util- ity)gaswells.Thisgasiscommonly known as wellhead gas.

IMPORTANT: For natural gas, check gas line pressure before connecting fireplace to gas line. Gas line pressure must be no greater than 14 inches of water. If gas line pressure is higher, heater regulator damage could occur.

CAUTION:Neverconnectpro- pane/LP fireplace directly to the propane/LPsupply.Thisfireplace requires an external regulator (notsupplied).Installtheexternal regulator between the fireplace and propane/LP supply.

For propane/LP units, the installer must supply an external regulator. The external regulator will reduce incoming gas pressure. You must reduce incoming gas pressure to between 11 and 14 inches of water. If you do not reduce incoming gas pressure, fireplace regulator damage could occur. Install external regulator with the vent pointing down as shown in Figure 20. Pointing the vent down protects it from freezing rain or sleet.

CAUTION:Useonlynew,black ironorsteelpipe.Internally-tinned copper tubing may be used in cer- tainareas.Checkyourlocalcodes. Usepipeof1/2"orgreaterdiameter to allow proper gas volume to fire- place. If pipe is too small, undue loss of volume will occur.

Installation must include an equipment shutoff valve, union, and plugged 1/8" NPT tap. Locate NPT tap within reach for test gauge hook up. NPT tap must be upstream from heater (see Figure 21).

IMPORTANT: Install equipment shutoff valve in an accessible location. The equipment shutoff valve is for turning on or shutting off the gas to the appliance.

Check your building codes for any special re- quirements for locating equipment shutoff valve to fireplaces.

Apply pipe joint sealant lightly to male NPT threads. This will prevent excess sealant from going into pipe. Excess sealant in pipe could result in clogged fireplace valves.

WARNING: Use pipe joint sealant that is resistant to liquid petroleum (LP) gas.

Propane/LP

 

 

Supply

 

External

Tank

 

 

Regulator

 

 

 

 

 

Vent

 

 

 

Pointing

 

 

 

Down

Figure 20 - External Regulator With Vent

 

Pointing Down

 

 

CSA Design-Certified

 

Equipment Shutoff Valve

 

With 1/8" NPT Tap*

Approved

 

PROPANE/LP

 

From External

Flexible

 

 

Regulator (11"

Gas Line

 

 

W.C.** to 14" W.C.

 

 

 

 

Pressure)

 

 

NATURAL

 

 

From Gas Meter

3" Minimum

(5"

W.C.** to

 

10.5" W.C.

 

 

 

 

 

 

Pressure)

Pipe Nipple Cap Tee Joint

 

Sediment Trap

 

 

Figure 21 - Gas Connection

*Purchase the optional CSA design-certified equipment shutoff valve from your dealer. See

Accessories, page 44.

16

www.desatech.com

111244-01D

Image 16
Contents Shown with Optional Cabinet Mantel/Hearth Base Accessory What to do if YOU Smell GASTable of Contents Safety Information Product Identification Provide adequate clearances around air openingsOptional Remote Control Accessories Product FeaturesLocal Codes UnpackingTools Required Phillips screwdriver Hood AssemblyHex wrench Scissors Providing Adequate Ventilation AIR for Combustion VentilationDetermining FRESH-AIR Flow for Fireplace Location Ventilation Air From Inside Building Ventilation AIRVentilation Air From Outdoors Installation Check GAS TypeInstallation Items BUILT-IN Fireplace InstallationFireplace Clearances Minimum Clearance to Combustible MaterialsIf you have not installed hood, follow instruc- tions on DepthOptional Mantel Installation Mantel Clearances for Built-In InstallationInstalling Optional Blower Accessory GA3450TA Reinstall top louverAlign shim under adjusting plate as shown in Figure Remove packaging from three remaining pieces of trimInstalling Blower Accessory CordTest to make sure blower is working properly For Built-In InstallationLower louver Connecting to GAS Supply Sediment TrapInstallation Items Needed Connecting Equipment Shutoff Valve to Heater ControlChecking GAS Connections Correct all leaks at once Els or page 25 for Remote-Ready ModelsOptional Wireless HAND-HELD Remote Control Accessories Installing ReceiverInstalling 9-Volt Battery in Hand-Held Remote Control Unit Battery Cover HousingOptional Wall Switch GWMS2 Remote-Ready Models Only Remove jumper wire from control valve see ,Installing LOG SET and Screen Models with One-Piece Screen OnlyOperating Fireplace Lighting InstructionsManual Lighting Procedure To Turn OFF GAS To ApplianceThermostat Control Operation Operating BlowerREMOTE-READY Models For Your Safety Read Before Lighting AUTO/OFF/ON Blower SwitchIf Using Optional Hand-Held Remote Optional HAND-HELD Remote OperationManual Mode Auto Thermostatic ModeAuto Shutoff Feature ON/OFF Series Model CghrcbOptional GWMS2 Wall Mounted Switch Key Pad Lock FeatureInspecting Burners Optional GWMT1 Wall Mounted ThermostatCleaning Maintenance Burner Flame PatternBurner Injector Holder and Pilot AIR Inlet Hole If burner flame pattern is incorrect, as shown in FigureLOG SET Wiring DiagramCabinet Troubleshooting Observed Problem Possible Cause RemedyIgnitor cable pinched or wet Ignitor cable dryBurner orifice is clogged Mote-Ready Models OnlyModels Only Or replace burner orificeWhen heated, vapors from Walls or furniture Cleaners, etc. may turn intoMote-Ready Models Only Power is low Slight smoke or odor duringGas odor even when control Fireplace produces unwantedErs, chemicals, new carpet Ment aboveThermostat Models SpecificationsRemote-Ready Models Replacement Parts Service HintsTechnical Service Parts Under WarrantyIllustrated Parts Breakdown Parts List Illustrated Models Firebox Models CDCFNR, Cdcfpr Illustrated Parts Breakdown Thermostat Models FDCFTN/TP, VDCFRN/RP CDCFNR/PR REMOTE-READY Models Accessories Equipment Shutoff Valve GA5010Brass Trim KIT GA6095 THERMOSTAT-CONTROLLED Blower KIT GA3450TAWALL-MOUNT Thermostat Switch GWMT1 WALL-MOUNT ON/OFF Switch GWMS2Cleaning KIT GCK/CCK Receiver and HAND-HELD Remote Control KIT Ghrcb and Cghrcb111244-01D 111244-01D Not a UPC

CDCFNR specifications

Desa CDCFNR, or the Community Development and Capacity Building Framework for Natural Resources, is a pioneering initiative designed to empower local communities in managing their natural resources sustainably. This comprehensive framework is particularly focused on fostering resilience and enhancing the socio-economic conditions of communities that depend on these resources.

One of the main features of Desa CDCFNR is its emphasis on community participation. The framework encourages active engagement of community members in decision-making processes, which ensures that the management of natural resources reflects the needs and aspirations of local populations. By involving communities, the framework promotes a sense of ownership, responsibility, and accountability towards natural resource management.

Technologically, Desa CDCFNR leverages various innovative tools and platforms to facilitate data collection, sharing, and analysis. Geographic Information Systems (GIS) are utilized to map natural resources and analyze spatial patterns, which aids in effective planning and resource allocation. Mobile applications are also employed to engage community members, allowing them to report changes in resource availability or environmental conditions in real time. This use of technology ensures that data-driven decisions can be made promptly, leading to more adaptive management strategies.

Another notable characteristic of Desa CDCFNR is its integrated approach. It does not view natural resource management in isolation; instead, it recognizes the interplay between social, economic, and environmental factors. This holistic perspective ensures that interventions are designed to address multiple dimensions of sustainability, including economic development, environmental conservation, and social equity.

Capacity building is at the heart of the Desa CDCFNR initiative. Training programs and workshops are organized to enhance the skills of community members in areas such as sustainable farming practices, water management techniques, and biodiversity conservation. By building local capacities, the framework aims to equip communities with the necessary tools and knowledge to manage their resources effectively and adapt to changing environmental conditions.

In summary, Desa CDCFNR focuses on community engagement, harnesses technology for better resource management, adopts an integrated approach to sustainability, and emphasizes capacity building. Together, these features position Desa CDCFNR as a transformative framework in the realm of community-led natural resource management, paving the way for sustainable development and resilience in local communities.