Desa CDCFNR installation manual Installing LOG SET and Screen, Models with One-Piece Screen Only

Page 21

INSTALLATION

Continued

IMPORTANT: The wire may be shortened but must not be lengthened.

4.Connect one bare wire end to each of the terminals of the provided wall switch.

5.Install the wall switch and cover in the wall.

INSTALLING LOG SET AND SCREEN

(Models with One-Piece Screen Only)

1.Remove log packaging material and discard packaging. Gently place log over burner (see Figure 35). Do not allow log to contact flame. If flame contacts log, soot will be created.

2.Reattach screen by placing the notches in the screen frame over the shoulder screws and pushing down.

Rear Brick

Liner

Figure 36 - Installing Rear Brick Liner

Log

Shoulder

Screw

Brick Liner

Bracket and

Screw

Screen

Figure 35 - Installing Log and Screen

INSTALLING BRICK LINERS AND LOG SET AND SCREEN (Models CDCFNR and CDCFPR Only)

1.Remove packaging from brick liners previ- ously removed from behind top louver.

2.Place rear brick liner against back of firebox. The left and right brick liners will hold this liner in place (see Figure 36). Be sure to hold the rear brick liner while installing the sides so it will not fall forward.

3.Install left and right brick liners using brackets and screws from hardware kit as shown in Fig- ure 37. Screw the bracket into top of firebox and against brick liners. Adjust bracket before tightening screw.

4.Remove log packaging material and discard. Gently place log over burner (see Figure 38). (Do not allow log to contact flame as this will create sooting.)

5.Insert each rod through ten rings located at top of screen (see Figure 39, see page 22).

Left Brick

Liner

Figure 37 - Installing Side Brick Liners

Log Set

Figure 38 - Installing Log

111244-01D

www.desatech.com

21

Image 21
Contents What to do if YOU Smell GAS Shown with Optional Cabinet Mantel/Hearth Base AccessoryTable of Contents Safety Information Provide adequate clearances around air openings Product IdentificationProduct Features Optional Remote Control AccessoriesLocal Codes UnpackingHood Assembly Tools Required Phillips screwdriverHex wrench Scissors AIR for Combustion Ventilation Providing Adequate VentilationDetermining FRESH-AIR Flow for Fireplace Location Ventilation AIR Ventilation Air From Inside BuildingVentilation Air From Outdoors Check GAS Type InstallationBUILT-IN Fireplace Installation Installation ItemsFireplace Clearances Minimum Clearance to Combustible MaterialsDepth If you have not installed hood, follow instruc- tions onMantel Clearances for Built-In Installation Optional Mantel InstallationReinstall top louver Installing Optional Blower Accessory GA3450TAAlign shim under adjusting plate as shown in Figure Remove packaging from three remaining pieces of trimCord Installing Blower AccessoryFor Built-In Installation Test to make sure blower is working properlyLower louver Sediment Trap Connecting to GAS SupplyConnecting Equipment Shutoff Valve to Heater Control Installation Items NeededChecking GAS Connections Els or page 25 for Remote-Ready Models Correct all leaks at onceInstalling Receiver Optional Wireless HAND-HELD Remote Control AccessoriesInstalling 9-Volt Battery in Hand-Held Remote Control Unit Battery Cover HousingRemove jumper wire from control valve see , Optional Wall Switch GWMS2 Remote-Ready Models OnlyModels with One-Piece Screen Only Installing LOG SET and ScreenLighting Instructions Operating FireplaceTo Turn OFF GAS To Appliance Manual Lighting ProcedureThermostat Control Operation Operating BlowerAUTO/OFF/ON Blower Switch REMOTE-READY Models For Your Safety Read Before LightingOptional HAND-HELD Remote Operation If Using Optional Hand-Held RemoteAuto Thermostatic Mode Manual ModeAuto Shutoff Feature ON/OFF Series Model CghrcbKey Pad Lock Feature Optional GWMS2 Wall Mounted SwitchInspecting Burners Optional GWMT1 Wall Mounted ThermostatBurner Flame Pattern Cleaning MaintenanceBurner Injector Holder and Pilot AIR Inlet Hole If burner flame pattern is incorrect, as shown in FigureWiring Diagram LOG SETCabinet Observed Problem Possible Cause Remedy TroubleshootingIgnitor cable pinched or wet Ignitor cable dryMote-Ready Models Only Burner orifice is cloggedModels Only Or replace burner orificeWalls or furniture Cleaners, etc. may turn into When heated, vapors fromMote-Ready Models Only Power is low Slight smoke or odor duringFireplace produces unwanted Gas odor even when controlErs, chemicals, new carpet Ment aboveSpecifications Thermostat ModelsRemote-Ready Models Service Hints Replacement PartsTechnical Service Parts Under WarrantyIllustrated Parts Breakdown Parts List Illustrated Models Firebox Models CDCFNR, Cdcfpr Illustrated Parts Breakdown Thermostat Models FDCFTN/TP, VDCFRN/RP CDCFNR/PR REMOTE-READY Models Equipment Shutoff Valve GA5010 AccessoriesBrass Trim KIT GA6095 THERMOSTAT-CONTROLLED Blower KIT GA3450TAWALL-MOUNT ON/OFF Switch GWMS2 WALL-MOUNT Thermostat Switch GWMT1Cleaning KIT GCK/CCK Receiver and HAND-HELD Remote Control KIT Ghrcb and Cghrcb111244-01D 111244-01D Not a UPC

CDCFNR specifications

Desa CDCFNR, or the Community Development and Capacity Building Framework for Natural Resources, is a pioneering initiative designed to empower local communities in managing their natural resources sustainably. This comprehensive framework is particularly focused on fostering resilience and enhancing the socio-economic conditions of communities that depend on these resources.

One of the main features of Desa CDCFNR is its emphasis on community participation. The framework encourages active engagement of community members in decision-making processes, which ensures that the management of natural resources reflects the needs and aspirations of local populations. By involving communities, the framework promotes a sense of ownership, responsibility, and accountability towards natural resource management.

Technologically, Desa CDCFNR leverages various innovative tools and platforms to facilitate data collection, sharing, and analysis. Geographic Information Systems (GIS) are utilized to map natural resources and analyze spatial patterns, which aids in effective planning and resource allocation. Mobile applications are also employed to engage community members, allowing them to report changes in resource availability or environmental conditions in real time. This use of technology ensures that data-driven decisions can be made promptly, leading to more adaptive management strategies.

Another notable characteristic of Desa CDCFNR is its integrated approach. It does not view natural resource management in isolation; instead, it recognizes the interplay between social, economic, and environmental factors. This holistic perspective ensures that interventions are designed to address multiple dimensions of sustainability, including economic development, environmental conservation, and social equity.

Capacity building is at the heart of the Desa CDCFNR initiative. Training programs and workshops are organized to enhance the skills of community members in areas such as sustainable farming practices, water management techniques, and biodiversity conservation. By building local capacities, the framework aims to equip communities with the necessary tools and knowledge to manage their resources effectively and adapt to changing environmental conditions.

In summary, Desa CDCFNR focuses on community engagement, harnesses technology for better resource management, adopts an integrated approach to sustainability, and emphasizes capacity building. Together, these features position Desa CDCFNR as a transformative framework in the realm of community-led natural resource management, paving the way for sustainable development and resilience in local communities.