Desa K42EP, K42EN Horizontal Termination Configurations, Ground Floor Installation

Page 10

10

VENTING INSTALLATION INSTRUCTIONS

Installation Planning (Cont.)

VENTING INSTALLATION INSTRUCTIONS

Continued

10.Place fireplace into position and shim with noncombustible ma- terial if needed. Nail or screw side flanges to framing to secure unit in place. IMPORTANT: Make sure fireplace is level before securing. If fireplace is not level it will not work properly.

WARNING: Never run vent downward as this may cause excessive temperatures which could cause a fire. Operation of improperly installed and main- tained venting system could result in serious injury, property damage or loss of life.

Minimum Pipe

Overlap 11/4"

Direct Vent

Pipe

Wall

Firestop

Maintain 1"

Minimum Air

Space Around

Outer Pipe When

Penetrating a Wall

10 3/4" x 10 3/4" Framed Opening

Siding Standoff

Screws

High Wind

Termination

Apply Mastic to

Outside Edge of

Standoff

Exterior Wall with Vinyl Siding

GROUND FLOOR INSTALLATION

Recommended Applications:

Installation using cabinet surrounds

Through the wall using round or square termination (up to 12" horizontal pipe)

NOT FOR CORNER INSTALLATION

45° Elbow

Horizontal High

Wind Square

Termination

Adjustable

Pipe 12" Max.

Wall

Firestop

Square Termination

Vertical (V)

Horizontal (H)

36 3/4"

17" max.

45° Elbow

Wall

Exterior Portion of Wall

 

Firestop (Round

Figure 13 - Typical Horizontal Termination Cap Mounting with Additional Siding Standoff Installed

Horizontal Termination Configurations

Figures 14 through 18 show different configurations and alternatives for venting with horizontal termination. Each figure includes a chart with critical minimum and maximum dimensions which MUST be met. IMPORTANT: Remember that a horizontal run of venting must have a 1/4" rise for every 12" of run toward the termination.

Firestop

Termination Only)

Horizontal

Round

Termination

Figure 14 - Horizontal Termination Configuration for Square or Round Termination

For..com

111922-01C

Image 10
Contents For Your Safety OWNER’S Operation Installation ManualFor Your Safety What to do if YOU Smell GAS Table of Contents Safety InformationProduct Identification Local CodesPRE-INSTALLATION Preparation Product FeaturesLocation and Space Requirements Clearances Framing and FinishingLocation of Termination CAP Balcony with Perpendicular Side Wall Venting Installation Instructions Installation PrecautionsInstallation Planning Horizontal Termination InstallationInstalling Siding Standoff Combustible Exterior Horizontal Termination Configurations Ground Floor InstallationCorner Installation Venting with Two 90 Elbows Installation for Vertical Termination Flat Ceiling InstallationVertical Termination Configurations High Altitude Installation Number DescriptionModel BK Installation Fireplace InstallationInstalling Optional Blower Accessory Check GAS TypeModel BKT Installation Blower Model BKTInstalling GAS Piping to Fireplace Location Blower Wiring DiagramInstallation Items Needed Connecting Fireplace to GAS SupplyPressure Testing Gas Supply Piping System Checking GAS ConnectionsREMOVING/REPLACING Glass Door Pressure Testing Fireplace Gas ConnectionsRemoving Louver Panels Cleaning Glass Door Removing Glass DoorInstalling LOGS, Lava Rock and Glowing Embers Wall Switch InstallationWiring Diagram Optional Remote ControlLighting Instructions For Your Safety Read Before LightingOperating Fireplace To Turn OFF GAS To ApplianceInspecting Burners Operating Optional Blower AccessoryPilot Assembly Burner Flame PatternPilot and Burners Cleaning MaintenanceGlass Door LogsTroubleshooting Observed Problem Possible Cause RemedyGas leak. See Warning statement at Specifications Replacement Parts Service HintsTechnical Service Parts Under WarrantyIllustrated Parts Breakdown ModelsParts List VK42N, VK42NH, VK42P, VK42PHBurner Assembly for Models VK42EN, VK42ENH, VK42EP, VK42EPH Burner Assembly for Models VK42N, VK42NH, VK42P, VK42PH Accessories Owners Registration Form Postage Required 111922-01C Warranty Information