7
•Insert two
•Place the handle assembly into the holes on the front of the smoker chamber door and secure with twowo
•Repeat on firebox door.
•Assemble spring handle by sliding springg throughthrough handlehandle rodrod until spring is in the middle of handle rodd asas shownshown inin insetinset..
•Insert spring handle through holes on thee sideside ofof fireboxfirebox andand secure with two
Fully tighten all screws and nuts.
Spring
Spring
Handle
Nut
Handle Rod | Firebox |
|
Screw
Spacer Handle
Fiber
Washer
Nut
8
•Remove wing nut from temperature gauge.
•Insert temperature gauge though smoker chamber lid hole above handle securing it from the underside with the wing nut removed aligning the gauge settings before fully tightening.
•Insert logo plate though smoker chamber lidlid holesholes toto thethe right of the handle, securing it from thee undersideunderside ofof thethe lidlid with two logo clips.
Temperature | Logo Plate |
Gauge |
|
Wing |
|
Screw | Logo Clips |
Page 11