Weber 42370 dimensions Structure

Page 12

12

6

a.

 

ASSEMBLY

 

CAUTION: Use two people to lift and install the Summit® Built-In frame assembly.

a.)

Lift the frame assembly into the “island” structure opening. Make sure the frame is resting level on the fi nished surface of

 

the structure.

b.)

Adjust the Front Vent to rest squarely on ground.

c.)

Apply a bead of silicone sealant (1) around the perimeter and front edges of the grill that are in contact with the “island”

 

structure. This will prevent moisture seepage. The sealant you use must have a temperature rating above 120°F (48.8° C).

Any Surface

24 inches (610mm)

 

Note: For a countertop treatment

 

 

 

 

 

inches24 (610mm)

Recommended 3/4 inch (19.1 mm)

(610mm)

24inches

overhang. Notch front edge for

 

 

 

frame to fully slide in.

Frame

c.

Any Surface

(1)

24 inches (610mm)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

inches24 (610mm)

 

 

Frame

 

 

 

(610mm)

24inches

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

b.

Image 12
Contents BUILT-IN NG GAS Grill Installation Guide Locating Your GrillClearance from Surfaces or Structures BUILT-IN Cutout Dimensions General Construction DetailsParts List Parts List Exploded View Platinum D4 Exploded View List Platinum D4 Exploded View Platinum D6 Exploded View List Platinum D6 Assembly Assembly Assembly Structure ASSEMBLY13 14ASSEMBLY Match Holder 16ASSEMBLY ASSEMBLY17 Typical Natural GAS Supply Installation General Specifications for PipingGAS Supply BUILT-IN GAS Line LocationsGAS Line Piping Test ConnectionsConnect GAS Supply Ventilation WEBER-STEPHEN Products CO