Stow manual Initial START-UP, Lifting and Moving the PSH, Starting the Engine

Page 16

PORTO-SCREED PSH — INITIAL START-UP

INITIAL START-UP

Lifting and Moving the PSH

Even though the PSH is lightweight, always use two people when lifting or moving the PSH.

This section is intended to assist the operator with the initial start-up of the PSH. It is extremely important that this section be read carefully before attempting to use the PSH in the field.

DO NOT attempt to operate the PSH until the Safety, General Information and Inspection sections of this manual have been read and thoroughly understood.

Starting the Engine

1.Place the engine fuel valve lever (Figure 9) to the "ON" position.

Figure 9. Engine Fuel Valve Lever

2.Place the trowel'sthrottle lever (Figure 10) to the "IDLE" position.

Figure 11. Engine Choke Lever

4.Place the choke lever (Figure 12) in the "OPEN" position if starting a warm engine or the temperature is warm.

Figure 12. Engine Choke Lever (Open)

5.Place the engine ON/OFF switch (Figure 13) in the "ON " position.

Figure 10. Throttle Lever (Idle Position)

Figure 13. Engine ON/OFF Switch

 

3.Placethe chokelever(Figure11) in the"CLOSED"position if starting a cold engine.

PAGE 16 — STOW PORTO-SCREED — OPERATION & PARTS MANUAL — REV. #1 (01/20/04)

Image 16
Contents PORTO-SCREED Page Heres HOW to GET Help PORTO-SCREED PSH-TABLE of Contents PORTO-SCREED PSH- Specifications PSH PORTO-SCREED PSH DimensionsEngine Specifications PORTO-SCREED PSH- Safety Message Alert Symbols If you do not follow these directionsAlways wear approved respiratory protection PORTO-SCREED PSH- Safety Message Alert SymbolsAlways wear approved eye and hearing protection Rules for Safe Operation SafetyAlways read, understand, and follow Transporting Maintenance SafetyEmergencies Operation and Safety Decals PORTO-SCREED PSH DecalsIntended USE PORTO-SCREED PSH- IntroductionIntroduction Assembly PORTO-SCREED PSH- AssemblyMoving the PSH Initial Servicing MixtureSpark plug once a week Muffler Used to reduce noise and emissionsPRE-INSPECTION Before StartingEngine Oil Check Fuel CheckLifting and Moving the PSH Initial START-UPStarting the Engine Starter Grip Stopping The EnginePORTO-SCREED PSH Operation OperationMaintenance Maintenance SchedulePORTO-SCREED PSH Troubleshooting Engine Troubleshooting EnginePORTO-SCREED PSH Suggested Spare Parts Belt 4L280PORTO-SCREED PSH Nameplate and Decals PORTO-SCREED PSH Nameplate and Decals SmallPORTO-SCREED PSH Assembly ENGINE, 4 HP. Honda GX120K1QX2 Terms and Conditions of Sale Stow PORTO-SCREED Operation & Parts Manual REV. #1 01/20/04 Please have the Model and Serial Number ON-HAND When Calling
Related manuals
Manual 28 pages 15.17 Kb