Braun 403 dimensions Fold tall yellow outer barrier Lift latch handle Down, Lower latch handle

Page 6

Braun Corporation FMVSS No. 403 Quick Reference Installation Sheet 34274 Rev. A

Handrail Operating Instructions

OUT (TO EXTEND PLATFORM):

1. Fold tall (yellow) outer barrier

2. a. Lift latch handle.

down.

b. Deploy / Stow handrail.

 

c. Lower latch handle.

b.

3.a. Lift latch handle.

b.Deploy / Stow handrail.

c.Lower latch handle.

a.

Latch c.

Handle

Detail

b.

1.Pull T-Handle.

2.Turn T-Handle to lock platform in released position.

3.Pull platform out.

4.Turn T-Handle.

5.Push T-Handle in.

6. Grasp outer barrier and attempt to move platform in and out until the platform locks (feel release mechanism engage).

DOWN (TO LOWER PLATFORM):

Using hand pump handle, open hand pump valve (turn counter- clockwise). Open 1/2 turn only.

DOWN (TO UNFOLD OUTER BARRIER):

 

W

 

 

ARNI

 

 

NG

 

Donot

remove!

 

 

 

VALVE

 

N

C

E

L

O

P

S

O

 

E

OPEN

CLOSE

 

a.

Note: Order of procedures

c.

shown is for stowing lift. To

 

deploy handrails and barrier

Latch

after extending the platform,

Handle

reverse order of procedures.

Detail

 

1.Remove hairpin cotter from detent pin.

2.Remove detent pin.

3.Unfold (rotate) barrier down.

UP (TO FOLD OUTER BARRIER):

 

Hairpin

Actuator

Cotter

 

TFORM

 

PLA

 

Detent

Pin

Manual Operating Instructions

1.Fold (rotate) barrier up.

2.Insert detent pin.

3.Insert hairpin cotter in detent pin.

BARRIER

OUTER

Familiarize yourself with the com- ponents necessary to manually operate the lift. The T-handle release cable releases and en- gages the lift platform to allow the platform to be manually extended and retracted. The manual back- up pump (hand pump) is used to manually lower and raise the ex- tended platform.

Hand

Pump

Pump

Handle

T-Handle

Release POWER

Cable PACK

Valve

Cable Activated Platform Manual Release System: A cable-activated manual release system releases and engages the platform carriage assembly drive chain to allow the platform carriage assembly to be manually moved out (extended) or moved in (retracted) as needed. A T-handle is provided on the release cable for activation of the manual release system (details follow).

After manually moving the platform in or out, it is extremely important that the cable-activated manual release is positively re-engaged to secure (lock) the platform carriage assembly before loading a passen- ger on the platform or before driving the vehicle.

After manually releasing platform, push manual release T-handle in fully and ensure platform is locked before driving lift vehicle.

Uncontrolled and unintention- al platform deployment (inad- vertent platform ejection) may result in serious bodily injury and/or property damage.

WARNING

Push T-handle in fully and manually move platform in and out to engage platform lock before driving vehicle. Failure to lock platform may result in unintended platform deployment. Unintended platform deployment may result in serious bodily injury and/or property damage.

UP (TO RAISE PLATFORM):

Using hand pump handle:

1.Close hand pump valve (turn clockwise).

2.Insert handle in pump and stroke.

Note: Close valve before operating electric pump.

IN (TO STOW PLATFORM):

1.Raise or lower platform to stow level (follow UP or DOWN procedures).

2.Pull T-Handle.

3.Turn T-Handle to lock platform in released position.

4.Push platform in.

5.Turn T-Handle.

6.Push T-Handle in.

7.Grasp outer barrier and attempt to move platform in and out until the platform locks (feel release mechanism engage).

 

VALVE

N

C

E

L

O

P

S

O

 

E

W

 

ARNI

 

NG

Donot

remove!

 

Image 6
Contents Locate Lift Mounting Brackets DOT Public Use Lift Nhtsa Vehicle Physical RequirementsDoor All-Thread Mounting Stud Lift Housing Jam Nuts Flat Washer Lift ClampSecure Lift Mounting BracketElectrical, Hydraulic and Interlock Floor Level Switch Calibration and Floor Level AdjustmentFmvss 403/404 Certification Checklist Ground Sense CalibrationUnfold fully ramp position Press the UP switch untilLevel and both outer barriers Passenger from platformLower latch handle Reverse order of proceduresFold tall yellow outer barrier Lift latch handle Down Lift latch handle Deploy / Stow handrail Lower latch handle750 CyclesAdjustments and Diagnostics
Related manuals
Manual 8 pages 38.31 Kb Manual 8 pages 55.79 Kb