Braun Corporation FMVSS No. 403 Quick Reference Installation Sheet 31312
,IFT /PERATING )NSTRUCTIONS
O
Q
S
U
UP
Switch
UP
Switch
TO LOAD PASSENGER:
1.Load passenger onto platform fac- ing outward and lock wheelchair brakes. See Photos Q and R.
Note: Outer barrier must be fully unfolded until entire wheelchair has crossed the barrier. See Pho- tos O and P.
2. Press UP switch until platform raises just above ground level. Release switch.
3.If necessary, press the switch arm LEVEL switch until platform is level. ![]()
4. Press UP switch until platform stops (reaches floor level) and inboard locator unfolds (see Photo W). Re- lease switch.
P
R
LEVEL Switch
T
V
Inboard Locator
(unfolded)
W
Y
AA
CC
5.Unlock wheelchair brakes and unload
passenger from platform.
TO STOW PLATFORM:
1. Press STOW switch until platform stops (fully stowed - vertical). Re- lease switch.
2.Press STOW switch (Photo Y) until platform sections close (rotate) to locked position. See Photos
TO CLOSE DOOR(S):
Power Door Operator(s):
Press the STOW switch until door(s) are fully closed. Release switch.
Manual Door(s):
Manually close door(s) fully.
X
Z
BB
DD