Polycom 6300 MCU manual Index, Oai

Page 49

Index

 

 

A

 

 

Attenuation

24

B

 

 

Base Stations

14

Cabling

23, 25

High Density

15

Maximum distance from MCU

21, 25

Mounting

37

Outdoor

39

C

 

 

Cabling

26

Base Stations

23

Demarcation blocks

29

Four wire digital

28

Outdoor Base Stations

39

Outside

30

Two-wire analog or digital

27

ccLink

15

Ceiling clip

37

Cell

See Base Station

Customer Support Hotline

4

D

 

 

DC Power

22

Demarcation blocks

29

Four-wire digital

32

Two-wire analog or digital

31

E

 

 

Ethernet Port

13

Expansion Shelf

 

 

Controller

13

H

 

 

High Density Base Stations

15

Hotline

4

PN: 1725-36121-001_J.doc

 

 

I

 

Installation steps (chart)

7

Interface Module

11

Interface Modules

13

Interface types

26

Intershelf Junction Panel

 

Description

14

L

 

Load balancing

29

M

 

MCU

 

Description

10

Location

20

Power

22

O

 

OAI

 

Part Numbers

13

Ports

13

System Controller Card

13

Open Application Interface

See OAI

Operator's Console

 

Specifications

19

Operator's Console

16

P

 

Power

35

Clearance

21

Controller

18

MCU

22

Pairs

23

Shelf requirements

13

Power circuit

22

Q

 

Quick Clip Fuse

18

 

49

Image 49
Contents SpectraLink 6300 MCU Facility Preparation Trademark Information Polycom Model Numbers About this GuideRelated Documents Icons and Conventions Customer SupportContents Install Base Stations Connect Power to ShelvesSafety Notices Index Installation Overview Install Shelves and Interface Modules Installation Steps and ResponsibilitiesSpectraLink 6000 System Description Master Control Unit SpectraLink 6000 System topology Shelf 1 Primary Shelf Intershelf Junction Panel System Controller CSC or CSO301, 306, ShelfExpansion Shelf CSC300, CSO300 Interface Modules CPA, CPU, CPM, CPP, CPF316Intershelf Junction Panel JPI300 Base StationsCcSpectraLink 6000 System SpectraLink 6000 Wireless TelephonesSpectraLink OAI Gateway Operator’s ConsoleSite Preparation Required hardware Required Materials Provided by CustomerOperator’s console PC System administratorUnion labor Prepare Location for ShelvesRack mounting Prepare rack or wallWall mounting Prepare Power for ShelvesRun Cables to Base Station Locations Wire specificationsPull cable Pair Function Pin #s Terminate Cables at Base Station LocationsPrepare Demarc Blocks Multiple power pairsTwo-wire Analog or Digital Connection Two-wire analog or digital interfaceFour-wire digital interface Program Telephone System Install Demarc BlocksAssign and program ports PN 1725-36121-001J.doc Telephone Ports Base Station Power Pairs Data Two-wire analog or digital demarc blockBase Station Power Pairs Data Four-wire digital demarc blockFour-wire Digital Connector B Connect demarc block 25-pair cable Run Conduit To Shelf Connect Power to Shelves+48V Mount Base Stations on Dropped Tile Ceilings Install Base StationsMount Base Stations on Finished Ceilings Wire outdoor base stations Install Outdoor Base StationsMount and connect outdoor Base Stations Power Up and Check Diagnostics Day one Day two Site Preparation Checklist Installation FormsPN 1725-36121-001J.doc Shelf Number Interface Module Base Station Location WorksheetShelf Interface Module Extension Assignments WorksheetImportant Safety Information Safety NoticesPage OAI IndexPN 1725-36121-001J.doc