11. INSTALLATION
Required floor, ceiling, and roof
CUT OUT FLOOR OPENING & FUEL LINE HOLE
a. Determine center of closet or alcove (Figure 13).
b.Locate center of the floor opening, measured 10" from the rear wall, and mark
c.Locate center of fuel line hole, measured 23- 1/4" from the rear wall and
d. Cut out floor opening and one fuel line hole.
!IMPORTANT:
Refer to the installation instructions provided with optional air conditioning packageswheninstallingfurnaceswith optional cooling coil cabinet or with optional
CUT OUT CEILING AND ROOF OPENINGS a. Locate center of Roof Jack opening, mea- sured 13 1/2" from the rear wall of closet or alcove along the center line of furnace and
floor opening. (See Figure 13)
MOUNTING | REAR WALL | |
PLATE | ||
|
FLOOR
OPENING
FUEL
LINE
HOLES
SUPPLY AIR DUCT
CUT DUCT OPENING 1/16TH. LARGER THAN DUCT CONNECTOR
Figure 14. Mounting Plate
| MOUNTING | SCREWS |
|
| |
UNDER DUCT OPENING | PLATE |
|
|
| |
MOUNTING | DUCT |
|
CONNECTOR |
| |
PLATE |
| |
|
| |
FLOOR |
|
|
OPENING |
|
|
FUEL |
| FUEL |
LINE |
| |
| LINE | |
HOLES |
| |
| HOLES | |
|
| |
SUPPLY AIR DUCT |
|
|
| Platinum Series | 14” SUPPLY |
CONNECTION |
Figure 15. Duct Connector
11