19 3/8" 18 13/16" Supply Duct

22 1/16"

16 1/4"

Electrical Knock-outs

Top View

 

60 1/4" Cabinet Width

 

19 3/8"

18 13/16" Supply

22 1/16"

Duct Opening

 

 

 

 

Electrical

53 1/4"

 

Connections

Cabinet

 

 

Height

 

 

23" Return

 

25 1/16"

 

Filter Rack

Duct Opening

 

Frame

5 1/16"

 

Condensate

 

Drain

53" Return Duct Opening

57" Filter Rack Frame

Front View

Figure 5. B5SM Physical Dimensions for Vertical Installations

27 3/8"Cabinet Depth (without Filter Rack)

16 1/4" Supply

Duct Opening

9 1/8"

 

 

 

2

 

 

295/16" Depth (with Filter Rack)

Side View

11

Image 11
Contents Vertical Application Horizontal Application Rear View Installation InstructionsPhysical Dimensions Horizontal Nitrogen Important Safety InformationLocating the Air Handler Before You Install the Air HandlerField Connections for Electrical Power Supply General InformationHorizontal Mounting Applications AIR Handler Installation Packaging RemovalConnecting Refrigerant Tubing Minimum Clearance RequirementsElectrical Rating Data Filter RequirementsPressure Drop Across Filters Electrical Wiring Example Unbalanced 3-Phase Supply VoltageStartup and Adjustments Pre-Start Check List Motor Sheave AdjustmentUnit Maintenance Front View 2 Ton Unit Refrigerant Line ConnectionsTon Unit Refrigerant Line Connections Side View Top View4182 666 Blower Performance DataGeneral Notes To yellow wire from economizerThree Phase only Notes Typical Air conditioner Thermostat Connections Typical Heat Pump Thermostat Connections 7090950 Maintenance Schedule