Haier ESA3105 manual English

Page 18

English

2 PREPAREFOR UNIT INSTALLATION-2

1.Remove the screws which fasten the cabinet at both sides and at the back.

2.Slide the unit from the cabinet by gripping the base pan handle and pulling forward while bracing the cabinet.

3.Insert the Frame Guide into the bottom of the cabinet.

Caution: Never expose plastic front or grille to extreme temperatures.

Shipping Screws

3 ASSEMBLECURTAINS/TOP RAIL

Install top rail with three 13/32"screws. Slide left-hand curtain assembly into left end of top and bottom rails. Repeat for right-hand curtain assembly. Fasten curtain retainer strips to sides of outer case with eight 13/32" screws.

PREPARE

Storm window installation

4 WINDOW FOR

If stormwindow frame does not allow

adequate clearancebelow sill (1/2"

INSTALLTION

required),remove stormwindow

 

frame or createclearanceby adding a

Inspect window track, sash, and sill

strip (at least1 1/2"

wide) along

 

wood

for its ability to support the weight of

 

 

air conditioner.

entirewidth of sill. Fastenwood strip

to sill with at leastthreecountersunk

 

Measure width between window

wood

screws(not suppliedwith kit).

Thisprovidesa smooth surface for

moldings to ensure Instant Mount

mounting air conditioner.

 

 

will fit window frame. Instant Mount

 

 

 

 

 

 

 

 

 

 

 

1/2"

models are designed for windows

 

 

 

 

 

 

 

 

 

wide (the detail see page 15)

1 1/2"

 

 

 

 

 

 

 

 

Min imum

 

Min imum

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

W ood

 

 

Instant Mount kit supplied with unit

 

 

 

Str ip

 

 

 

 

SI LL

 

 

is designed for mounting in most

 

 

 

 

 

 

 

 

 

 

 

double-hung windows without

 

 

I

 

 

storm windows. For installation in

 

 

N

O

 

 

D

window frame with storm window,

 

 

U

 

 

O

 

 

T

modify sill by adding wood strips (not

 

 

O

 

 

D

included) to inner and outer sills. This

 

 

R

O

 

 

 

 

 

 

 

 

 

raises unit and eliminates

St orm

Wi ndo w

O

R

interference of storm window frame.

Fram

e

 

 

Mobile home window installation Add wood strip (at least1 1/2" wide) along entirewidth of window sill.

Thicknessof wood strip shouldmatch heightof front lip on window frame. Fastenwood strip to sill with a minimum of threecountersunkwood screws(not suppliedwith kit). This providesa smooth surface for mounting air conditioner.

Mus tbe a mini

mum

of 1/2"

to lc ear

botto m rail

on

unit

1 1/ 2"

 

 

 

 

Window

Minimum

 

 

 

Frame

 

 

 

W ood

 

 

 

Strip

I

 

 

 

O

N

 

 

 

U

D

 

 

 

T

O

 

 

 

D

O

 

 

 

O

RO R

Image 18
Contents 0010551962 Page English English 13-18 15-18 19-20 20-21 English English English Page Remote control and control panel operations English English English Vent Control Operations English Parts Installing Unit into a Window English Top rail About Bottom rail Seal Gasket GuideCleaingandCare GnitohSelbuorT English English