Haier HSU-229M07, HSU-129M07 Operation, Power failure resumeplease set and apply as necessary

Page 7

Operation

Remote controller's operation

When in use, put the signal transmission head directly to the receiver hole on the indoor unit.

The distance between the signal transmission head and the receiver hole should be within 7m without any obstacle as well.

Don't throw the controller, prevent it from being damaged.

When electronic-started type fluorescent lamp or change-over type fluorescent lamp or wireless telephone is installed in the room, the receiver is apt to be disturbed in receivering the signals so the distance to the indoor unit should be shorter.

Loading of the battery

Load the batteries as illustrated. 2 R-03 batteries, resetting key (cylinder)

Remove the battery cover:

Slightly press " " and push down the cover.

Load the battery:

Be sure that the loading is in line with the" + "/"-" pole request as illustrated.

Put on the cover again

Confirmation indicator:

In disorderation, reload the batteries or load the new batteries after 6mins.

Note:

Use two new same-typed batteries when loading.

If the remote controller can't run normally or doesn't work at all, use a sharp pointed item to press the reset key.

Hint:

Remove the batteries in case unit won't be in usage for a long period.

If there are any display after taking-out just need to press reset key.

Power failure resume(please set and apply as necessary)

If sudden power failure occurs, the unit will resume original operation when power is supplied again.

Note: When sudden power failure happens during unit operation in power failure resume mode, if the air conditioner is not desired for use in a long period, please shut off the power supply in case that the unit automatically resume operation when power is re-supplied, or press ON/OFF to turn off the unit when power resumes.

5

Image 7
Contents Split Type Room AIR Conditioner Contents Machine is adaptive in following situation Indoor Unit Parts and FunctionsClock set Operation Buttons and display of the remote controllerHints Hints Remote controllers operation Power failure resumeplease set and apply as necessaryOperation FAN Select operation modeEnjoy yourself by just a gentle press Unit startFan speed selection Select temp. settingCOOL,HEAT and DRY operation RecommendationsLeft and right air flow adjustment manual Air flow direction adjustment2TIMER mode selection Timer OperationTo cancel Timer mode Set Clock correctly before starting Timer operation5Time setting for Timer OFF To cancel Timer mode3Time setting for Timer on Time confirming for Timer onPi Pi Removal of the restriction of emergency or test operationPower Failure Resume Function Cool modeComfortable Sleep Cleaning of unit casing MaintenanceCleaning of air filter Attach new Air Purifying Filter Open the lnlet GrilleDetach the standard air filter Detach the Air Purifying FilterNever fail to observe the followings Better use of air conditionerBefore asking for service, check the following first Trouble shooting