c. Connect green tubing (G) from the DOWN |
OPEN fitting to the 90° tube fitting on the side |
of the OUTLET DOWN dosing valve. |
Setup
See the following table to understand the relationship between pump stroke and dose valve actuation.
d. Connect red tubing (R) from the DOWN |
CLOSED fitting to the 90° tube fitting on the |
end of the OUTLET DOWN dosing valve. |
3. Repeat these steps for each pump in your |
system. |
UPEXH
Table 1 Dose Valve Actuation
Pump | Up Inlet | Down |
Stroke | Valve | Inlet |
|
| Valve |
Up | Open | Closed |
Down | Closed | Open |
|
|
|
Up
Outlet
Valve
Open
Closed
Down
Outlet
Valve
Closed
Open
G
R
G
R
DOWNEXH
G
R
G
R
Figure 8 Pump Tubing Schematic
OPEN
INLET UP
CLOSED
OPEN
OUTLET UP
CLOSED
OPEN
INLET DOWN
CLOSED
OPEN
OUTLET DOWN
CLOSED
332339B | 7 |