Bard P1124A3, P1224A2 installation instructions

Page 35
Image 35
Contents Installation Instructions Single Package AIR Conditioners Contents For More INFORMATION, Contact These Publishers Getting Other Information and PublicationsGeneral Field Installed Heater Packages OptionalGeneral Instructions Shipping DamageFan Motor and Condenser Electrical SpecificationsHz Circuit a Compressor Circuit a414 Fan Motor and Condenser Intentionally Heater Package Volts Model PhaseThis column Is left blankSize Optional Field Installed Electric Heater TableHtr. KW Circuit B Capacity @ 240 Volts @ 208 Volts Htr. Amps Fuses Circuits Ampacity ProtectionDimensions of Units Location InstallationTypical Installations Slab Mounting AT Ground Level Airflow and Service Access ClearancesElevated Mounting Platforms Roof TOP ApplicationMIS-1177C Field Fabricated Curbing Dimension for X in FIGUnit Model Roof Hood Dimension Roof Curb DetailsCondensate Drain Trap Condensate Drain TrapAIR Filters Filter Requirements & SizesThermostats Wiring Main PowerWiring 24V LOW Voltage Control Circuit Transformer TapsLOW Voltage Wiring Start UP and Operation Adjustable DELAY-ON-MAKE and DELAY-ON-BREAK Timer AdjustmentsLOW Pressure SWITCH, BYPASS, and Lockout Sequence Alarm OutputFAN Blade Settings Service and TroubleshootingService Hints Pressure Service PortsESP P1124A3 P1130A2 P1136A2 P1142A3 P1148A2 P1060A1 Brazing DiagramSuction and Discharge Tube Brazing Indoor Blower PerfomanceReturn Air Pressure 100 105 110 115 Model Pressure TablePressure Table Evidence of Moisture Troubleshooting ECM Blower MotorsMotor rocks slightly when starting Motor wont start ∃ Run Mositure Check∃ Perform Moisture Check Motor starts but runs erraticallyExcessive noise Page Page Page Page Page Page Page