ACCESSORIES | ||
|
|
|
FACTORY INSTALLED EQuIPMENT
•
DRIVE ROLL KITS uSED
• See Parts Pages
|
|
| Timer Kit |
| Includes: Panel and harness |
|
| |
|
|
|
|
|
| for adjusting preflow, burnback |
|
|
|
|
|
|
|
| and postflow times. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Plastic Case |
| Includes: a complete engi- |
|
| |
|
|
|
|
|
| neered plastic case. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| AWG 1/0 Coaxial Power Cable |
|
|
|
| |
|
|
|
| Includes: 1/0 Coaxial weld |
|
| ||
|
|
|
|
|
| cable of length "xx". Ends of |
|
|
|
|
|
|
|
| the weld cable have lug con- |
|
|
|
|
|
|
|
| nections. Use for Pulse weld- |
|
|
|
|
|
|
|
| ing. |
|
|
|
|
|
|
|
|
|
|
|
|
|
| AWG #1 Coaxial Power Cable |
| Includes: AWG #1 Coaxial |
|
| |
|
|
|
|
|
| |||
|
|
|
|
|
| weld cable of length "xx". |
|
|
|
|
|
|
|
| Ends of the weld cable have |
|
|
|
|
|
|
|
| lug connections. Use for |
|
|
|
|
|
|
|
| Pulse or STT™ welding. |
|
|
|
|
|
|
|
|
|
|
|
|
|
| Work and Feeder Cables Package |
| Includes: |
|
| |
|
|
|
|
|
| 2/0 cable 14' (1.2m) long with |
|
|
|
|
|
|
|
| Ground Clamp, and Twist- |
|
|
|
|
|
|
|
| Mate to Lug 2/0 Cable 9' |
|
|
|
|
|
|
|
| (2.7m) long. |
|
|
|
|
|
|
|
|
|
|
|
|
|
| Weld Power Cable, |
| Includes: |
|
| |
|
|
|
| Lug |
| 1/0 cable of length "xx". |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| IIncludes: Lug to Lug, 3/0 |
|
|
|
|
|
|
|
| Cable of length "xx" for lengths |
|
|
|
|
| Weld Power Cable, Lug to Lug |
| up to 60' (18.3m). Lug to Lug, |
|
| |
|
|
|
|
|
| 4/0 Cable of length "xx" for |
|
|
|
|
|
|
|
| lengths greater than 60' |
|
|
|
|
|
|
|
| (18.3m). |
|
|
|
|
|
|
|
| |||
|
|
|
|
|
| |||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|