Lincoln Electric manual AC-1200 Scott Connection Diagram

Page 17

F-2

DIAGRAMS

F-2

 

 

 

AC-1200 SCOTT CONNECTION DIAGRAM

TWO SINGLE MACHINES SCOTT CONNECTED

WARNING

 

 

 

Disconnect input power before servicing.

 

 

 

Do not operate with covers removed.

 

 

3 PHASE SUPPLY LINES

Do not touch electrically live parts.

 

 

Only qualified persons should install, use

 

 

PHASE SEQUENCE A-C-B (N.A.)

ELECTRIC SHOCK or service this equipment.

C

B

A

CAN KILL

N.D.,N.E.

 

 

N.D.,N.E.

N.C.

 

 

N.C.

ELEC.

PRIMARY

1

 

 

 

 

1

PRIMARY

ELEC.

SEC.

7

N.B.

 

100

7

SEC.

8

 

8

 

 

90

 

9

 

 

 

9

 

 

80

 

WORK

 

10

 

 

 

 

10

 

WORK

 

 

4

 

 

 

 

4

 

 

TEASER TRANSFORMER (TRAIL ARC)

MAIN TRANSFORMER (LEAD ARC)

AC-1200 OR AC1500

 

 

AC-1200 OR AC1500

 

 

 

 

TRAIL

 

 

 

 

LEAD ARC

 

 

 

WORK

ARC

 

 

 

 

 

 

 

 

 

 

 

TRAVEL

 

 

 

 

 

 

 

 

 

NOTE: The two arcs must be properly phased relative to each other, if the electrical connections are not as shown above, poor welding will result.

A way to verify the proper phase angle and phase sequence is to measure the A.C. voltage at the welding nozzles.

1.Do not weld during the voltage measurements. Back the electrode out of each wire drive,then press the NA-4 start buttons.

CAUTION - Voltage will be high between the two electrode nozzles.

2.Voltage readings between nozzles to work, and nozzle to nozzle should be per table:

PHASE

LEAD ARC

TRAIL ARC

LEAD ARC TO

 

 

ANGLE

TO WORK

TO WORK

TRAIL ARC

 

 

 

V

V

Value

 

Relationship

 

 

 

 

 

 

 

 

100 o

90 VAC

90 VAC

138 VAC

 

1.53 x V

*

90 o

90 VAC

90 VAC

127 VAC

 

1.41 x V

80 o

90 VAC

90 VAC

116 VAC

 

1.29 x V

 

If voltages do not agree, recheck all wiring and the proper sequence of the input supply lines.

* If using the 90 o phase angle connection, the phase sequence cannot be determined by voltage measurement. To determine the phase sequence use one of the following methods.

1.Use a phase meter.

2.Use an oscilloscope.

3. Temporarily reconnect the machine to either the 100o tap or the 80 o tap and check the voltage per note 2.

N.A. To obtain proper phase sequence at the welding arcs, the input line sequence must be A-C-B.

N.B. Interconnect machines as shown for the desired phase angle.

N.C. Frames of all welding power sources must be grounded per National Electric Code.

N.D. Electrode cables of paralleled machines should be connected to the same range tap.

N.E. The weld cables for each arc, and work must be of proper capacity for the current and duty cycle of the immediate and future applications.

B

M13026

IDEALARC® AC-1200

Image 17
Contents Idealarc AC-1200 California Proposition 65 Warnings SafetyElectric Shock can kill Welding and Cutting Sparks can Cause fire or explosion IvSAFETY Thank You TAbLE of Contents Location InstallationConnection of AC-1200 with NL Option DuTy CyCLE Operation Safety PrecautionsMaintenance TROUbLESHOOTING Symptoms TROUbLESHOOTING Diagrams AC-1200 Scott Connection Diagram AC-1200 Scott Connection Diagram AC-1200 and Paralleled DC-1000’s AC-1200 and DC-1500’s AC-1200 Wiring Diagram With NL Option Idealarc AC-1200 Idealarc AC-1200 Idealarc AC-1200 Precaucion Warnung