Crestron electronic ST-DS manual Problem Solving, Fully Discharging the ST-BTP, Troubleshooting

Page 10

Docking Station/Charger

Crestron ST-DS

Method 3: ST-BTP Installed in an Active Touchpanel

This method is identical to method 2, except that the touchpanel is active (ON) while charging. As a result, the time to fully charge a discharged ST-BTP can take up to three hours.

Fully Discharging the ST-BTP

Due to the memory effect of nickel-cadmium (NiCad) cells, Crestron recommends that the ST-BTP be fully discharged for every 25 charge/discharge cycles. The ST-BTP can be fully discharged while in the touchpanel. A button to fully discharge the touchpanel should be available within a designated screen design. This button has a special software identity (reserve join number) and can be recreated and programmed onto any page in the touchpanel project. Consult your Crestron dealer if this feature cannot be located.

Problem Solving

Troubleshooting

The table below provides corrective action for possible trouble situations. If further assistance is required, please contact a Crestron customer service representative.

ST-DS Troubleshooting

TROUBLE

POSSIBLE

CORRECTIVE ACTION

CAUSE(S)

 

 

Green PWR

ST-DS is not

Confirm that power pack securely plugged into

LED does not

receiving power.

outlet and that the connector is properly attached

illuminate.

 

to the ST-DS.

Red CHG

ST-DS is in "charge

The rechargeable power pack is either too hot/cold

LED blinks

pending" mode.

or has extremely low voltage. No action is

once per

 

necessary. The ST-DS monitors the ST-BTP and

second.

 

begins a fast charge as soon as conditions are

 

 

favorable. Charging occurs when the ST-BTP

 

 

temperature is between 59-86 °F (15-30 °C).

Red CHG and

ST-DS has

Properly position the ST-BTP in the ST-DS cavity.

RDY LEDs

intermittent contact

The four contacts may be dirty. Unplug the

blink four

with the ST-BTP.

external power pack and clean the contacts with a

times per

 

dry, lint-free cloth.

second.

Incorrect external

Verify that the external power pack is the

 

power pack being

recommended power supply (i.e., Crestron part

 

used.

no. PW-1215 (110v) or PWI-1215 (210v)).

Red CHG and

Hardware Error

Stop using the ST-DS.

RDY LEDs

 

Contact an authorized Crestron Dealer or Crestron

oscillate back

 

Customer Service.

and forth.

 

 

 

 

 

6 Docking Station/Charger: ST-DS

Operations Guide - DOC. 5738A

Image 10
Contents Page Crestron Contents Page Description Functional DescriptionPhysical Description ST-DS Indicators ST-DS PortPower Source SetupMethod 1 ST-BTP Alone Method 2 ST-BTP Installed in an Inactive Touchpanel Method 3 ST-BTP Installed in an Active Touchpanel Problem SolvingTroubleshooting Fully Discharging the ST-BTPFuture Updates Further InquiriesMerchandise Returns / Repair Service Return and Warranty PoliciesCrestron Limited Warranty Memory Effect External 1500 mA Power PackST-DS Optional Charging Guide This page intentionally left blank Operations Guide DOC a Docking Station/Charger ST-DS ∙ Crestron Electronics, Inc Operations Guide DOC a Crestron ST-DS