Line up the holes in each Small Caster (1) with the holes on the Base (4). One Small Caster
(1)is to be attached to each side of the Base (4). For each Small Caster (1), slide four (4) Bolts (27) up through a Spring Washer (7), and through Washer (6) and into Base (4).
Step 2) | Slide each Leg (8 & 25) into each of the two slots on top of the Base (4). Insert two Pins (3) |
| through the Base (4) at the junction of each Leg (8 and 25). Attach a Hitch Pin (24) through |
| each of the four (4) Pins (3) to secure together - see Figure 1. |
|
| Base (4) | |
|
|
| Make certain to set up the Crane |
| Hitch Pin (24) |
| on a flat, stable, level surface. |
|
|
| |
| Leg (25) | ||
|
| ||
| Pin (3) | Leg (8) | |
|
| ||
|
| Figure | |
Step 3) | With the assistance of another person, attach the Support Post (10) to the Base (4). Insert | ||
| both Bolts (9) down through the bottom bracket of the Support Post (10). Slide on Washers | ||
| (32), and slide on Spring Washers (33). Tighten Nuts (18) - see Figure 2. |
| Grip (36) | |
Caution: Be aware of dynamic |
| |
loading! A sudden start or jerk of | Support Post (10) | |
the chain and hook may create for | ||
| ||
a brief instant, an excess load, |
| |
which may result in damage to the | (27) | |
product and/or personal injury. | ||
(4) | Washers (32) | |
| Spring Washer (33) | |
| Nuts (18) |
| Figure |
Step 4) | Attach both of the Supports (11) to the Base (4), one at each end. For each Support, insert a |
| Bolt (12) through the hole in the bottom of the Support (11), and through the Base (4). Slide |
| on Washers (34), Spring Washers (35) and tighten on Nut (2) - see Figure 3 on following |
| page. Line up the holes at the top of the Support (11) with the second hole down on the |
| Support Post (10). Attach Supports (11) to the Support Post with Bolt (12). Slide on Washer |
| (34) and Spring Washer (35). Tighten on Nut (2). |
| REV 11/02; 05/05 |
Sku 46766 | For technical questions, please call | Page 4 |