OPERATION
Loading The Nailer
To load your nailer:
1.Disconnect the air supply from the nailer!
2.Push the magazine latch in the direc- tion shown in Figure 1.
Figure 1. Releasing magazine latch.
5.Push the magazine cover forward until the magazine latch locks in place.
Depth Adjustment
1.Rotate the depth adjustment wheel (shown in Figure 3) clockwise to increase the nail driving depth.
2.Rotate the finger wheel
3. Pull back the magazine cover until it |
|
stops. | Figure 3. Depth adjustment wheel. |
4.Point the nailer down and insert a stick of brad nails into the magazine
as shown in Figure 2. Make sure that | Operating The Nailer | |
the pointed ends of the nails rest in | If you have not read the safety instruc- | |
the slot at the bottom of the magazine. | ||
tions in this manual, do not operate the | ||
| ||
| nailer. | |
| Before you operate your nailer, place one | |
| drop of the included oil into the quick con- | |
| nect fitting where the nailer connects to the | |
| air supply. Fire the EMPTY nailer | |
| before beginning, so oil does not come out | |
| onto the project during regular operation. | |
Figure 2. Loading the nailer. |
|
H2910 |