Cobra Electronics CPI 1000 Quick Evaluation Before Installation, Plug in the test load, Minimum

Page 5
Power Button
Connect Terminals
Connect Power Source
Quick Evaluation Before Installation
This section provides you with basic information about the inverter and how to check its performance before installation.
Introduction
Quick Evaluation
Before Installation

10274_CPI1000_vC 8/14/07 3:48 PM Page 4

Be sure to have on hand:

Quick Evaluation

Before Installation

Introduction

To check your inverter’s performance before installation:

1. Turn the inverter off (see page 14 for details). If the power source is a DC power supply, switch it off as well.

Power Source

The power source must provide

 

between 11 and 15 volts DC and

 

be able to supply enough current to

 

run the test load. As a rough guide,

 

divide the wattage of the test load by

 

10 to get the current (in amperes)

the power source must deliver.

Cables to connect the power source to the inverter. Cables are supplied with the unit that are two feet long overall from the tip of the clamp shown to the stripped and tinned end for insertion in the Input End of the unit.

If user supplied cables are to be used, they must be as short and thick as possible in order to reduce the voltage drop between the power source and the inverter when it is drawing current from the power source.

If the cable suffers an excessive voltage drop, the inverter may shut down when drawing higher currents because the voltage at the inverter dropped below 10 volts.

Power Button

Connect Test Load

2.Connect cables to power input terminals (see page 8 for details).

3.Connect cables to power source (see page 8 for details).

4.Check to make sure all connections are secure.

5.Turn the inverter on. If the power source is a DC power supply, switch it on first.

6.Plug in the test load.

The inverter should supply power to the load. If the inverter is not working properly, refer to the troubleshooting guide on page 20 or power and protection indicators section on page 16.

A test load that can be plugged into the AC receptacle on the inverter for short term testing at a low power level. The following cables are recommended for testing low power level test loads only.

Test Load

Test Load

Minimum

 

Power

Cable Size

100W # 16 AWG copper

250W # 12 AWG copper

500W # 8 AWG copper

USB Outlet

NOTE A USB device can be used to check the output of the USB Outlet.

 

 

Nothing Comes Close to a Cobra5

4

Image 5
Contents Our Thanks to You How Your Cobra Power Inverter WorksCobra line of quality products includes Hours a day, 7 days a week 773-889-3087 phoneContents Product FeaturesGeneral Precautions Important Safety InformationImportant Safety Information Cobra 1000 Watt Output Waveform To check your inverter’s performance before installation Quick Evaluation Before InstallationPlug in the test load MinimumMounting Installation RequirementsConnecting Cables included Connecting CablesConnect cables to the power source To connect the cables between the inverter and the batteryConnect Cables Ground Wiring Power ConsumptionPower Consumption Ground WiringRemote On/Off Switch Power On and OffUsing the Power Button Operating IndicatorsOperating Indicators Input Voltage Operating Indicators Operating LimitsOperating Limits Power Output Specifications Troubleshooting GuideTroubleshooting Guide SolutionMaintenance Product Service Warranty and Trademark AcknowledgementWest Cortland Street, Chicago, IL 60707 USA Accessories Order FormOptional Accessories