Nortel Networks 411-2021-111 MHz cellular band, Channel assignment for 800 MHz cellular systems

Page 20

1-4Introduction

The 800 MHz cellular band

In an 800 MHz North American cellular system, a frequency spectrum of 50 MHz is available for service. Operating from 824 to 894 MHz, including the expanded spectrum, the system conforms to the AMPS IS-54 protocol.

Typically this range is divided into 832 radio frequency (RF) channelsThe. 832 RF channels are divided into two bands,A and B. The two bands are identified as follows:

Band A—for Non-Wireline Operators

Band B—for Wireline Operators.

Each frequency band has 416 RF channels. Of these 416 RF channels, typically 21 (depending on the frequency plan) are assigned as the Control Channels (CCH) and the remaining 395 are Voice Channels (VCH). See Figure 1-4 and Table 1-1.

Figure 1-4

Channel assignment for 800 MHz cellular systems

 

 

 

Base Station Frequency (MHz)

 

 

 

 

RX

824

825

A-Band CCH

835

B-Band CCH

835

846.5

849

851

TX

869

870

880

890

891.5

894

896

 

 

Band

A"

A

B

A'

B'

R

991

1

333

 

 

666

716

799

 

1023

Channel Number

 

 

 

R=Reserved

 

 

 

 

 

 

 

 

 

 

 

 

Channel assignment

 

Band A (416 channels)

Band B (416 channels)

 

 

 

 

 

 

 

 

 

Control channels

 

313

- 333 (21)

334 - 354 (21)

 

 

 

 

 

 

 

 

 

 

 

 

Optional—TDMA secondary

 

688

- 708

(21)

737 - 757

(21)

 

 

control channels

 

 

 

 

 

 

 

 

 

 

 

 

Voice channels

 

001 - 312

(312)

355 - 666

(312)

 

 

 

 

667

- 716

(50)

717 - 799

(83)

 

 

 

 

991

- 1023 (33)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

411-2021-111 Standard 01.01 June 1996

Image 20
Contents DualMode Metrocell Page Page Publication history JuneContents Power and Grounding Requirements Cell Site ComponentsDatafilling a Metro Cell Site AppendicesBlock diagram of a 120 Stsr Metrocell using one RF Frame List of tablesPage About this document Intended audience for this publicationHow this publication is organized Applicability of this publicationCarrier RF List of termsBand Cell DBmDBW DuplexerFilter Forward pathIsolation LossModulation OmniDqpsk Return lossSectorization Signal RFSector Stsr Introduction Northern Telecoms DualMode MetrocellSystem architecture of a DualMode Metrocell Digital ready cellular productBasic components of a DualMode Metrocell Universal CE Frame Metro RF FrameChannel assignment Band a 416 channels Band B 416 channels 800 MHz cellular bandChannel assignment for 800 MHz cellular systems Introduction 6Introduction Standard 01.01 June Overview Cell Site ConfigurationsOmni configuration Sectorized configuration Omni N=7 frequency reuse plan120 N=7 sectorized frequency reuse plan 60 N=4 sectorized frequency reuse plan Omni cell site configuration Cell Site LayoutsControl Channel redundancy RF FrameCell Site Layouts 4Cell Site Layouts Transmit cabling TRU/DPA6Cell Site Layouts Receive cabling Component requirementNo. Frames TRUs ATCsStsr cell site configuration CE Frame Block diagram of a 120 Stsr Metrocell using one RF Frame RF FrameBlock diagram of a 120 Stsr Metrocell using three RF Frames 12Cell Site Layouts DPA 9 Port1 CCH ATC3 Port DPA 10 Port1 14Cell Site Layouts TRU/DPA ATC 16Cell Site Layouts Sector Sector Y Sector ZSector Y TX/RX, 3 RX Stsr cell site connection Control Channel Locate Channel Receiver SectorSector U Sector W22Cell Site Layouts Block diagram of a 60 Stsr Metrocell with two RF Frames 24Cell Site Layouts Block diagram of a 60 Stsr Metrocell with four RF Frames 26Cell Site Layouts Transmit cabling 28Cell Site Layouts TRU/DPA 30Cell Site Layouts Port2 ATC3 Port DPA Port1 RF Frame 32Cell Site Layouts Receive cabling 34Cell Site Layouts Sector Y 36Cell Site Layouts Component requirement 38Cell Site Layouts Standard 01.01 June Cell Site Components Major components of a DualMode Metrocell DescriptionNTAX98AA FRU Customer Service Operations 4Cell Site Components Standard 01.01 June Power and Grounding Requirements Safety requirementsPower and grounding requirements Power and Grounding Requirements 4Power and Grounding Requirements Frame power distribution Power distribution for the CE and RF Frames in a MetrocellSystem power protection Grounding UL/CSA approvalCEC par DC coupled signals Cable Identification 10Power and Grounding Requirements Standard 01.01 June Datafilling a Metro Cell Site Datafill OverviewTable Clli Table AcualmCavities Fan Pwr Alarm PointsMetro RF Frame ATC Hsmo +27V a Port # Rip Connector J206Table VCHINV, CCHINV, Lcrinv Frequency Assignment Example Example of Metro TRU datafillExample of Metro ICRM/TRU hardwire configuration Icrm8Datafilling a Metro Cell Site Standard 01.01 June Radio Frequency Appendix a DualMode Metrocell Cell Site SpecificationsSystem Configuration Alarms Audio InterfaceMechanical DC Power RequirementsPower Distribution Requirements Packaging EnvironmentalTelecom Compliance Regulatory Electromagnetic EmissionsRadiated Emissions Product Safety Appendix B Frequency Plans =7 Frequency plan Band a=7 Frequency plan Band B =4 Frequency plan Band a =4 Frequency plan Band B10Frequency Plans Standard 01.01 June Page Cell Site Description