CONTENTS
1 PLEASE READ IMMEDIATELY 3
1.1Important Information
1.2Legal Provisions and Directives
1.3
2PURPOSE OF THE HEAT
PUMP | 4  | 
2.1Application
2.2Principle of Operation
3  | BASELINE UNIT  | 4  | 
4  | ACCESSORIES  | 5  | 
4.1Brine Manifold
4.2Brine Pressostat
5  | TRANSPORT  | 5  | 
6  | INSTALLATION  | 6  | 
6.1General Information
6.2Sound Emissions
7 MOUNTING  | 6/7  | 
7.1General
7.2
7.3Connection on Heat Source Side
7.4Electrical Connection
8 COMMISSIONING  | 8  | 
8.1General
8.2Preparatory Steps
8.3Commissioning Procedure
9 CARE/CLEANING  | 8/9  | 
9.1Care
9.2Cleaning of Heating Side
9.3Cleaning of Heat Source Side
10  | MALFUNCTIONS/TROUBLE-  | 
  | 
  | SHOOTING  | 9  | 
11  | DECOMMISSIONING  | 9  | 
11.1Summer Shutdown
11.2
12 APPENDIX  | 10  | 
2