Delta 40-540 warranty

Page 6

8.Rotate bracket (M) Fig. 10, back to its original posi- tion as shown, and tighten the two screws that fasten bracket (M) to rod (N). These screws were loosened in STEP 6. Then tighten lockhandle (R) to hold rod (S) in position.

9.Slide end of chip blower tube (T) Fig. 11, onto end of air nozzle (V), as shown.

10.Assemble tool holder (X) Fig. 12, to the right side of the scroll saw using two screws (W).

11.The tool holder(X) Fig. 13, is used to hold the quick- set blade changing wrench (Y), (for removing blade from lower blade holder), allen wrench and extra blades.

12.Refer to sections "CHANGING BLADES" and "ADJUSTING BLADE TENSION" for assembling blade and applying correct tension on the saw blade.

S

M

N

R

Fig. 10

T

V

Fig. 11

W

X

W

Fig. 12

X

Y

Fig. 13

6

Image 6
Contents Model Safety Rules Always Wear EYE ProtectionAdditional Safety Rules For Scroll Saws Unpacking and CleaningAssembly Instructions CC OPage Page Connecting Scroll SAW to Power Source Grounding InstructionsFastening Scroll SAW to Supporting Surface ON-OFF and Variable Speed Switches Locking ON-OFF Switch in the OFF PositionTable Insert Changing Blades Adjusting Blade TEN- Sion Adjusting Clamping Action of Upper Blade Holder Tilting the TableAdjusting Holddown Adjusting Dust BlowerLeveling the Table Following a Line Inside CuttingLubrication Choice of Blade and SpeedBlade Breakage