Cisco Systems 2691 quick start Left

Page 10

The brackets for Cisco 2691 routers are shown in Figure 1.

Note The slots in the brackets marked RIGHT are for securing cables with cable ties.

Figure 1 Brackets for Rack-Mounting of Cisco 2691 Routers

Bracket pair for 19-inch rack

Slots for cable tie attachment

Bracket pair for 23-inch rack

Slots for cable tie attachment

LEFT

Narrow bracket for

chassis side opposite fans

RIGHT

Wide bracket for

chassis side with fans

23" ETSI, NEBS LEFT

For chassis side

opposite fans

ETSI, NEBS

RIGHT

 

23"

 

 

with fans

 

88810

For chassis side

 

Attaching Brackets

Attach the mounting brackets to the chassis as shown in Figure 2, Figure 3, Figure 4, or Figure 5, using the screws provided in the bracket kit. Use a number 2 Phillips screwdriver to install the bracket screws.

Caution Your chassis installation must allow unrestricted airflow for chassis cooling. For mounting in a 19-inch rack, be sure to install the wide bracket (marked RIGHT) on the side where the cooling fans are located. For installation on a desktop, keep at least 1 inch of clear space beside the cooling fans.

Figure 2 Bracket Installation for Center Mounting with Front Panel Forward

23" ETSI, NEBS LEFT

SESERIE

S

RIES

Left bracket

for 23-inch rack

Left (narrow) bracket

for 19-inch rack

Use two screws on each side.

82689

RIGHT

ETSI, NEBS

RIGHT

 

23"

 

Right (wide) bracket for 19-inch rack

Right bracket

for 23-inch rack

10

Image 10
Contents Cisco 2691 Modular Routers Replacement, Repair, or Refund Policy for Hardware Cisco 90-Day Limited Hardware Warranty TermsDuration of Hardware Warranty To Receive a Return Materials Authorization RMA NumberInstall Chassis Documents, Equipment, and ToolsImportant Safety Instructions OBS! Spara Dessa Anvisningar Guarde Estas Instruções GEM Disse Anvisninger Metal object to the terminals. Statement Installing the Chassis Rack-Mounting the ChassisLeft Installing Chassis in Rack Grounding the Chassis AsyncConnect Cables Power ConnectionsSystem Management Connections DC Wiring Requirements StatementBe connected first and disconnected last. Statement + BWAN, LAN, and Voice Connections Port or Connection Port Type, Color Connected To CableFront Panel Indicators Power Up the RouterChecklist for Power-Up Power-Up ProcedurePerform Initial Configuration Initial Configuration Using the Setup Command Facility Enter a host name for the router this example uses Initial Configuration Using the CLI Manual Configuration Configuration is displayedInterface Numbering WAN and LAN Interface NumberingWhere to Go Next Voice Interface NumberingCisco.com Obtaining DocumentationOrdering Documentation Obtaining Technical Assistance Submitting a Service RequestDocumentation Feedback Cisco Technical Support WebsiteDefinitions of Service Request Severity Obtaining Additional Publications and InformationPage USA
Related manuals
Manual 34 pages 39.14 Kb