Havis-Shields installation instructions Installation Instructions KK-RLL, Tools Required

Page 1

INSTALLATION INSTRUCTIONS KK-RLL

ROOF MOUNTED LOAD LIGHT

TOOLS REQUIRED:

 

Power drill

Safety goggles

Caulk gun with silicone

Wrench set

3/8” drill bit

 

HARDWARE SUPPLIED:

 

1

Work Light with Double Lamp

HE-90600B

2

5/16 -18 x 1” Stainless Hex Head Bolt

GSM34010

2

5/16-18 Nylock Nut

GSM30017

2

5/16” x 1 ½” Fender Washer

GSM31019

1

3/8” Plastic Grommet

GSM20003

1

Light mounting Bracket

PRM97310

INSTALLATION INSTRUCTIONS:

Note: Mounting and wiring must be done prior to prisoner compartment installation.

1.Bolt light fixture to the mounting bracket. (End with 2” flange and one hole). Overall bracket size is 10 ½” long by 2” wide.

2.Position load light bracket in desired location on roof: Recommended location is to center light above door opening on side or rear of van. If there is a third brake light, position the work light over the third brake light not on top of light.

3.Mark and drill three (3) 3/8” diameter holes. Bolt the bracket assembly on with two (2) stainless steel 5/16-18 x 1” bolts, nuts and fender washers.

4.The 3rd 3/8” diameter hole is for the wire. Wire goes through the roof and the bracket. Insert 3/8” plastic grommet in the hole from inside van going outside. Run wire through the bracket and grommet. Silicone the hole.

5.Follow the attached wiring diagram for the standard 3-way switching included in kit. This gives the option of turning light on from the cab of the vehicle or the rear or side doors.

Note: See attached wiring diagram.

Note: If desired, light can be activated with a single pole single throw switch in the dash.

H:\KwKit\KK-RLL-INST-4-05.doc

Image 1
Contents Installation Instructions Installation Instructions KK-RLLRoof Mounted Load Light Tools RequiredKwik KIT Option