Hobart Welding Products HWC-115A manual Int Ext

Page 7

2-3. Voltage Sensing Lead Connections And Motor Start Control Adjustment

1

 

 

 

2

CV

 

CC

INT.

 

EXT.

 

 

Front

 

 

 

3

1

2

3

 

4

 

 

RC3

1Center Baffle

2Circuit Board PC1

3Jumper Plug

4Receptacle RC3

Internal (INT) and external (EXT) are stamped on PC1 just above RC3. Unit is shipped with jumper plug in internal (INT) position.

5Potentiometer R70

6Voltage Sensing Lead

For constant current welding (CC), place jumper plug in the EXT position. Connect voltage sensing lead to workpiece.

For constant voltage welding (CV), place jumper plug in the INT posi- tion. Do not connect voltage sens- ing lead.

To adjust motor ramp speed, re- move protective cap (if present), and adjust potentiometer R70 us- ing a small nonconductive screw- driver. Rotating R70 clockwise in- creases the time it takes the motor to ramp up to speed.

Reinstall wrapper.

5

6

For CC operation, connect voltage sensing lead to workpiece.

Work

Rear View

Tools Needed:

1/4 in

ST-801 840 / ST-150 035

OM-185 480 Page 5

Image 7
Contents Processes OM-185 480BDescription From Hobart to You Fumes and Gases can be hazardous to your health Safety Precautions for ARC WeldingSymbol Usage Arc Welding HazardsAdditional Installation, Operation, And Maintenance Hazards Static Electricity can damage parts On circuit boards Principal Safety StandardsRemoval of input power on inverters EMF InformationTypical Process Connections InstallationGun/Feeder Connections INT EXT Weld Cable Connections Contact Closure Connections Input Power ConnectionVolt Model Controls OperationShielding Gas Months Maintenance & TroubleshootingTrouble Remedy TroubleshootingCircuit Diagram Electrical DiagramComplete Assembly Of HWC-115A Parts ListDia Part Description Quantity Mkgs 123 123 123 Call HOBART1 for your local Hobart distributor Hobart Welding Products Contact your Distributor for