Grizzly G1029Z2P Site Considerations, G0548Z/G0548ZP Assembly, Floor Load, Placement Location

Page 19

Site Considerations

Floor Load

GZ[Zgidi]ZMachine Data Sheet[dgi]ZlZ^\]i VcY [ddieg^ci heZX^[^XVi^dch d[ ndjg bVX]^cZ# HdbZ gZh^YZci^Va [addgh bVn gZfj^gZ VYY^i^dcVa gZ^c[dgXZbZci id hjeedgi Wdi] i]Z bVX]^cZ VcY deZgVidg#

Placement Location

8dch^YZg Zm^hi^c\ VcY Vci^X^eViZY cZZYh! h^oZ d[ bViZg^VaidWZegdXZhhZYi]gdj\]ZVX]bVX]^cZ! VcY heVXZ [dg Vjm^a^Vgn hiVcYh! ldg` iVWaZh dg di]ZgbVX]^cZgnl]ZcZhiVWa^h]^c\VadXVi^dc[dg ndjg cZl bVX]^cZ# HZZ Figure 10 [dg i]Z b^c^" bjbldg`^c\XaZVgVcXZh#

(,

',

Figure 10.B^c^bjbldg`^c\XaZVgVcXZh#

Children and visitors may be seriously injured if unsuper- vised around this machine. Lock entrances to the shop or disable start switch or power connection to prevent unsupervised use.

BdYZa<%*)-O"<&%'.O'EB[\#.$&& 

G0548Z/G0548ZP

Assembly

To assemble your dust collector:

1. EaVXZ i]Z WVhZ jeh^YZ Ydlc dc V [aVi! egd"

iZXiZYhjg[VXZ#

2. 6iiVX]i]ZXVhiZghidi]ZWVhZl^i]&+*¿&+"&-

m&¿'[aVc\ZWdaih!Vhh]dlc^cFigure 11#

m&+

Figure 11.8VhiZg^chiVaaZYdcWVhZ#

3. Ijgc i]Z WVhZ dkZg! Va^\c i]Z bdidg VcY

^beZaaZg VhhZbWan l^i] i]Z bdjci^c\ ]daZh!

i]ZchZXjgZi]ZVhhZbWanl^i])*¿&+"&-m&¿'

[aVc\ZWdaih!Vhh]dlc^cFigure 12#

m)

Figure 12.BdidgVcY^beZaaZgVhhZbWan^chiVaaZY

dcidi]ZWVhZ#

"&,"

Image 19
Contents G0548Z G1028Z2/G1029Z2 Dust CollectorSs ,EAD from Leadbased PAINTS Table of Contents NdjgBVXcZ IntroductionManual Accuracy Contact Info Machine DescriptionComponents and Terminology Dust Collectors Impeller Information Construction Lidji ZVgc\ egdiZXidc XVc XVjhZ eZgbVcZci ZVgc\adhh# SafetySafety Instructions for Machinery DWhZgkc\ bVXcZgn id gZYjXZ iZ gh` d ZnZZghWZXdbZVYhigVXidc# Children & BYSTANDERS. @ZZe XaYgZcAdditional Safety for Dust Collectors Circuit Information Power SupplyAvailability Full-Load Current RatingCircuit Requirements for G0548Z/ G0548ZP/G1029Z2/G1029Z2P G1028Z2 Circuit Requirements for 120V Operation Prewired50 ft G1028Z2 Circuit Requirements for 240V OperationExtension Cords Minimum Gauge Size 14 AWGItems Needed Qty Voltage Conversion G1028Z2 OnlyTo convert the Model G1028Z2 to Description Qty SetupNeeded for Setup UnpackingBox 2 Figure Qty G0548Z/G0548ZP InventoryBox 1 Figure Qty  =VgYlVgZ7V\Inventory BdYZa%*-O&%.OEB\#.$&&  G1028Z2/G1029Z2/ G1029Z2P InventoryBox Components Qty Not Shown QtyFloor Load G0548Z/G0548ZP AssemblyPlacement Location Site ConsiderationsDjiaZi8dccZXidg Vh`Zi8VchiZg Hjeedgi =Zm7dai 8VchiZgHViaVi mbbdVbHige8VchiZg 7Zai8aVbe +m%dVbHige 7V\8aVbe 8daaZXidc G1028Z2/G1029Z2/ G1029Z2P AssemblyTo assemble your machine Vhhdlcc # EjiVh`Zi=ZgZ DjiaZiaVc\ZWdYn# AdlZg Hjeedgi 7gVX`Zih8aVbe =dhZ 8aVbeh IjgciZbVXcZedlZghliXOFF#  Power ConnectionConnecting Power Disconnecting Power # Test RunTo test run the machine General Duct Material Designing SystemPlastic Duct Flexible Duct Metal DuctSketch a Basic Duct Layout System DesignDecide Who Will Design Sketch Your Shop LayoutMachine Approximate Determine Required CFMsMachine `ZZebjaieaZWgVcXZhdeZcVidcZibZ# Determining Main Line Duct SizeDetermining Branch Line Duct Size EB#Loss Per Foot Planning Drop DownsCalculating Duct Resistance Duct Approximate DiaDescription Model Quantity Compile Materials ListAdditional Factors EgZhhjgZ#System Grounding General OperationsMachine Storage GZeaVXZbZciXVchiZg# AccessoriesMetal Branches Metal ElbowsG6163-4 Clamp G7343-5 Clamp G7361-6 Clamp Reducers & AdaptersLubrication MaintenanceCleaning Bags ScheduleCidiZXdaaZXidcWV\# Replacing BagsTo replace the collection bag  chiVaaVcZlXdaaZXidcWV\#Hnbeidb EdhhWaZ8VjhZ EdhhWaZHdajidc ServiceTroubleshooting Motor & ElectricalEZgdgbVcXZ# Dust Collector OperationEdcZcih WiringWiring Safety Instructions Shock HAZARD. Ldg`c\dclgc\iVihXdcE699AHLI8= G0548Z/G0548ZP Wiring Diagram#&%-OhiVgi XVeVXidg# G1028Z2 Wiring DiagramVolt G1029Z2/G1029Z2P Wiring DiagramE699AHLI8= G0548Z/G0548ZP Main Breakdown Parts=*,-EVgih 7gZV`Ydlc dcPage G0548ZP Main Parts List G0548Z Main Parts ListDescription H5783 Canister Filter AssemblyG1028Z2/G1029Z2 Main Breakdown G1029Z2 Main Parts List G1028Z2 Main Parts ListG1029Z2P Main Breakdown G1029Z2P Main Parts List 10. 8dbbZcih $5342!, .# 0/ /8  %,,.!- 7!  EaVXZ HiVbe =ZgZ22!.49 !.$ 2%452.3 Order Hours a DAY