Grizzly G0508 owner manual Blast Gate

Page 26

Always guard against static electrical build up by grounding all dust collection lines.

Ensure that the entire system is grounded. If using plastic blast gates to direct air flow, the grounding wire must be jumped (Figure 32) around the blast gate without interruption to the grounding system.

 

Plastic

 

Blast Gate

Copper

 

Ground

Metal Duct

Wire

 

Figure 32. Ground jumper wire when using

plastic blast gates and metal duct.

External Ground

 

Wire

 

Internal

 

Ground

Ground Screw

Wire

 

Flex-Hose Figure 33. Flex-hose grounded to machine.

We also recommend wrapping the outside of all plastic ducts with bare copper wire to ground the outside of the system against static electrical build up. Wire connections at Y’s and T’s should be made with wire nuts.

Attach the bare ground wire to each stationary woodworking machine and attach to the dust collector frame with a ground screw as shown in Figure 33. Ensure that each machine is continu- ously grounded to the grounding terminal in your electric service panel.

-24-

G0508 10 HP Industrial Dust Collector

Image 26
Contents Model G0508 HP Industrial Dust Collector Page Table of Contents Contact Info IntroductionForeword Machine Data Sheet Impeller Information Identification G0508 10 HP Industrial Dust Collector Safety Instructions for Machinery Additional Safety for Dust Collectors Circuit Requirements 220/440V 3-Phase GroundingRewiring to Items Needed for Setup SET UPSet Up Safety UnpackingContents Figure Qty InventorySite Considerations AssemblyPlacement Location Floor LoadPage Page Lower collection bag secured to Collector Test Run To test run the dust collectorDuct Material Designing SystemGeneral Metal DuctFlexible Duct Plastic DuctSketch Your Shop Layout System DesignDecide Who Will Design Sketch a Basic Duct LayoutMachine Determine Required CFM of Each MachineMachine Approximate Total CFM Branch Line Size Determining Main Line Duct Size Determining Branch Line Duct Size Calculating Duct Resistance System Grounding Blast Gate Accessories Metal Duct Starter KitReducers & Adapters Metal ElbowsMetal Branches G6252-4 Floor Sweep G7341-5 Floor Sweep G7342-6 Floor SweepDust collection pipe clamps H2443-Universal AdapterOperations Schedule MaintenanceLubrication Bag Cleaning Daily CheckTroubleshooting ServiceAbout Service Motor & Machine OperationDust Collection Operation Designing the System on Page 17 for moreG0508 220V switch Electrical ComponentsWiring Diagram Parts Breakdown Parts List DescriptionLabel Placement Warranty and Returns Page Page Page