INSTALLATION

NEW HOME CONSTRUCTION

Refer to Figure 5

1.Cut out wall plate (9) between two studs at the location of VacPan™. Cut a 6 3/4" piece of wall plate and refasten to floor temporary rough-in block. (10) This will act as temporary rough-in block that will force all trades to finish around providing a slot in wall for installation of VacPan™. Make certain that screws (11) remain exposed so that block can be removed in the future.

2.Flooring contractor must run flooring under block.

3.Rough-in pipe and low voltage leads (12) to location of VacPan™ outlet. Ensure final fitting is installed 1" off finished floor with 1/2" of play in piping to allow VacPan™ to be slid into position.

9

12

12"

FLEX

11

10

Refer to Figure 5

12

FIGURE 5

9

1.If ceiling is installed below and access to pipe is not possible, cut 2 3/4" X 4 1/2" access hole (13) in wall above VacPan™

(6). Reach through access hole, lift pipe and slide VacPan™ into position and push elbow onto VacPan™.

2.Cover access hole with cover plate (14).

13

14

 

6

FIGURE 6

Product specifications subject to change without notice.

4820 Red Bank Road, Cincinnati, Ohio 45227

1140 Tristar Drive, Mississauga, Ontario, Canada L5T1H9

Printed in U.S.A., Rev. 3/02

Image 4
Contents VacPan Automatic Dustpan Inlet If Access Cannot be Made from below Refer to FigureInstallation Option #2 in Walls Along Base Boards Installation NEW Home Construction Flooring contractor must run flooring under block