INSTALLATION
OPTION #2 - IN WALLS ALONG BASE BOARDS
Refer to Figure 3 (ACCESS TO PIPING FROM BELOW)
1.Locate studs (1) in the wall at the location VacPan™ will be installed.
2.VacPan™ should be located tight to one side in stud space.
3.Drill a small reference hole (2) through the floor under area of VacPan™. This will establish location from basement.
4.From below, use hole saw to remove wood floor and wood plate at location of VacPan™ between studs in wall cavity to provide access hole (3) from below.
5.Using a 11/2" hole saw, remove a 6 3/4" long slot (4) in baseboard tight to one stud.
1
1
2
4
3
FIGURE 3
Refer to Figure 4
6.Make wire connections to brass terminal and sprig terminal screws (5).
7.Secure VacPan™ (6) to baseboard using #6 screws provided.
8.From below, reach through hole (3) in stud space and push elbow (7) onto VacPan™ (6).
9.Make piping connections (8) as required to tie into existing central vac piping.
7
8
5
6
3 | FIGURE 4 |
|