Installation, cont’d
TPS150 Switching and Transmission System Installation2-2
Installation

Mounting the Transmitter and Receiver

The TPS150 comes with rubber feet for the transmitter and receiver, a set of
MTR102 rack ears for the transmitter, and a set mounting brackets for the receiver.

Rack mounting the transmitter

If desired, rack mount the transmitter as follows:
1. Remove the rubber feet from the bottom of the transmitter.
2. Attach the 992546-2 rack mounting ears to the transmitter with the six
provided #8 machine screws (figure 2-1).
3. Insert the transmitter into the rack, aligning the holes in the mounting bracket
with those of the rack.
# 8 Screw (6 Plcs)
Each Side
INPUT SELECT
1234BLANKMUTEPOWER
PROJECTOR
POWERVOLUME
TPT150
A/V Switcher / Twisted Pair Transmitter
Figure 2-1 — Mounting the transmitter
4. Secure the transmitter to the rack using the supplied machine screws.

Projector mounting the receiver

If desired, projector mount the receiver as follows:
1. Remove the rubber feet from the bottom of the receiver.
2. Attach the supplied 992547-2 projector pole mounting brackets to the receiver
with the four provided #8 machine screws (figure 2-2).