Carrier 50JS ÐSelect and Install Ductwork, ÐProvide for Condensate Disposal, Unit Maximum Weight

Page 6

5.Tighten the tension buckle until it is taut. Lifting brackets must be secure in the handholds.

6.Attach field-supplied clevis or hook of sufficient strength to hole in the lifting bracket (See Fig. 8).

7.Attach the 2 safety straps directly to the clevis or hook at the 4 rigging brackets. DO NOT attach the safety straps to the lifting brackets (See Fig. 8).

 

 

 

 

914-137"

 

 

 

 

“A”

 

(36"-54")

 

 

 

 

 

 

 

 

“B”

 

 

 

 

 

 

 

 

 

 

 

DETAIL A

 

 

 

 

 

SCALE 0.250

 

 

 

TIGHTEN STRAPPING SECURELY

 

 

 

 

WITH TENSION BUCKLE

 

 

 

 

INSTALL SAFETY STRAPS TO

 

 

 

 

RIGGING CLEVIS AT 4 RIGGING BRACKETS

 

 

 

 

PLACE RIGGING BRACKET ASSEMBLY IN 4

 

 

 

 

HAND HOLES AND INSTALL TIE DOWN STRAP

 

 

 

 

AROUND PERIMETER OF UNIT AND THROUGH

 

 

SEE DETAIL A

 

SPACE IN BRACKET ASSEMBLY

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

C99075

UNIT

MAXIMUM WEIGHT

 

A

B

 

Size

lb.

kg.

in.

mm.

in.

mm.

50JS018

305

138.4

19.5

495.3

16.75

425.5

50JS024

311

141.1

18.5

469.9

16.75

425.5

50JS030

309

140.2

19.5

495.3

17.50

444.5

50JS036

313

142.0

19.5

495.3

17.75

450.9

50JS042

345

156.4

19.5

495.3

17.75

450.9

50JS048

375

170.1

20.5

520.7

20.62

523.8

50JS060

440

199.6

19.5

495.3

19.75

501.7

50JX024

321

145.6

19.0

482.6

18.25

463.6

50JX030

342

155.2

20.0

508

19.25

489

50JX036

350

158.8

20.0

508

19.0

482.6

50JX042

372

168.8

21.0

533.4

20.5

520.7

50JX048

377

171.0

20.0

508

21.25

539.8

50JX060

450

204.2

21.0

533.4

20.0

508.0

Fig. 8ÐSuggested Rigging

8.Position lifting point directly over the unit's center of gravity.

9.Lift unit. When unit is directly over the roof curb, remove the 2 safety straps. Lower the equipment onto the roof curb.

Step 5ÐSelect and Install Ductwork

The design and installation of the duct system must be in accordance with the standards of the NFPA for installation of non-residence type air conditioning and ventilating systems, NFPA 90A or residence-type, NFPA 90B and/or local codes and ordi- nances.

Select and size ductwork, supply-air registers, and return air grilles according to ASHRAE (American Society of Heating, Refrigera- tion, and Air Conditioning Engineers) recommendations.

The unit has duct flanges on the supply- and return-air openings on the side of the unit.

When designing and installing ductwork, consider the following:

For vertical supply and return units, tools or parts could drop into ductwork and cause serious injury or death. Install a 90 degree turn in the return ductwork between the unit and the conditioned space. If a 90 degree elbow cannot be installed, then a grille of sufficient strength and density should be installed to prevent objects from falling into the conditioned space. Units with electric heaters require 90 degree elbow in supply duct.

1.All units should have field-supplied filters or accessory filter rack installed in the return-air side of the unit. Recommended sizes for filters are shown in Tables 1A and 1B.

2.Avoid abrupt duct size increases and reductions. Abrupt change in duct size adversely affects air performance.

IMPORTANT: Use flexible connectors between ductwork and unit to prevent transmission of vibration. Use suitable gaskets to ensure weather tight and airtight seal. When electric heat is installed, use fireproof canvas (or similar heat resistant material) connector between ductwork and unit discharge connection. If flexible duct is used, insert a sheet metal sleeve inside duct. Heat resistant duct connector (or sheet metal sleeve) must extend 24-in. from electric heater element.

3.Size ductwork for cooling air quantity (cfm). The minimum air quantity for proper electric heater operation is listed in Tables 2A and 2B. Heater limit switches may trip at air quantities below those recommended.

4.Seal, insulate and weatherproof all external ductwork. Seal, insulate and cover with a vapor barrier all ductwork passing through conditioned spaces. Follow latest Sheet Metal and Air Conditioning Contractors National Association (SMACNA) and Air Conditioning Contractors Association (ACCA) mini- mum installation standards for residential heating and air conditioning systems.

5.Secure all ducts to building structure. Flash,weatherproof, and vibration-isolate duct openings in wall or roof according to good construction practices.

CONVERTING HORIZONTAL DISCHARGE UNITS TO DOWNFLOW (VERTICAL) DISCHARGE UNITS

Before performing service or maintenance operations on system, turn off main power to unit. Turn off accessory heater power switch if applicable. Electrical shock could cause serious injury or death.

1.Open all electrical disconnects before starting any service work.

2.Remove side duct covers to access bottom return and supply knock outs.

3.Use a screwdriver and hammer to remove the panels in the bottom of the base pan.

4.Reinstall the side duct covers to block off the horizontal air openings.

NOTE: These panels are held in place with tabs similar to an electrical knockout.

NOTE: Avoid abrupt duct size increases and reductions. Abrupt change in duct size adversely affects air performance.

Step 6ÐProvide for Condensate Disposal

NOTE: Ensure that condensate-water disposal methods comply with local codes, restrictions, and practices.

6

Image 6
Contents Troubleshooting Receiving and InstallationMaintenance Safety ConsiderationsUnit Weight Unit Height Center of Gravity Electrical Characteristics50JX042 IN. MM 50JS04850JS060 50JX048ÐCheck Equipment Receiving and InstallationÐGeneral Unit Size ODS Catalog NumberÐProvide Clearances InstallationÐProvide Unit Support ÐRig and Place UnitÐSelect and Install Ductwork Unit Maximum WeightÐProvide for Condensate Disposal AÐPhysical Data BÐPhysical DataC99030 ÐInstall Electrical ConnectionsC99061 C99013ÐWiring Schematics A00073A00074 TDR Time Delay Relay Thermostat Heating Tran Transformer A00075AÐElectrical DataÐ50JS RLA LRA FLAMocp → BÐElectrical DataÐ50JX Minimum Circuit Amps Mocp Maximum Overcurrent Protection Full Load AmpsLocked Rotor Amps Rated Load AmpsPRE-START-UP Special Procedures for 208-V OperationÐStart-Up Adjustments START-UPÐTypical Heat Pump Operation, Heating Mode Checking and Adjusting Refrigerant Charge AÐWet Coil Air Delivery Unit 50JS 018-060 Deduct 10% forUnit Motor Speed External Static Pressure IN. WG BÐWet Coil Air Delivery Unit 50JX 024-060 Deduct 10% for Indoor Airflow and Airflow Adjustments SpeedC00032 MaintenanceC00030 C00031C99035 C99031C99033 C99032AIR Filter Indoor Blower and MotorOutdoor FAN System Information C99097C99029 ÐCooling and Heating Troubleshooting Chart Symptom Cause RemedyCooling and Heating Troubleshooting Chart contd START-UP Checklist Remove and Store in JOB FilePage Page Book Tab 5a 5a Catalog No Form 50JS,JX-1SI Replaces 50JX-2SI

50JS specifications

The Carrier 50JS is a high-performance rooftop unit designed for commercial applications, combining advanced technology with energy efficiency to deliver optimal heating and cooling performance. Its compact design allows for easy installation, making it an ideal choice for various settings such as retail spaces, schools, and office buildings.

One of the standout features of the Carrier 50JS is its innovative energy efficiency. Equipped with a high-efficiency scroll compressor, it significantly reduces energy consumption while providing reliable climate control. This model boasts a commendable SEER (Seasonal Energy Efficiency Ratio) rating, which translates to lower utility bills and a reduced carbon footprint, meeting modern energy efficiency standards.

The 50JS unit utilizes R-410A refrigerant, an environmentally friendly option that contributes to its low global warming potential compared to traditional refrigerants. This aligns with Carrier's commitment to sustainability and reducing environmental impact.

Another significant characteristic of the 50JS is its advanced controls and intelligent building integration capabilities. The unit comes with a microprocessor-based control system that allows for precise temperature management and can be easily integrated into building automation systems. This feature enhances user experience, providing real-time data and better management of HVAC operations.

Noise reduction technology is also a key design focus of the Carrier 50JS. The unit incorporates sound-attenuating materials and features that minimize operational noise, making it suitable for noise-sensitive environments like offices and educational institutions.

In terms of air quality, the 50JS offers various filtration options, including high-efficiency filters that remove airborne particulates. This results in cleaner, healthier indoor air, which is crucial for occupant comfort and well-being.

Furthermore, the rooftop unit is built to withstand harsh weather conditions, featuring a durable cabinet constructed from galvanized steel with a corrosion-resistant finish. This enhances the unit's longevity and reliability over time.

In conclusion, the Carrier 50JS rooftop unit stands out in the commercial HVAC market due to its energy efficiency, advanced controls, quiet operation, and robust design. It represents a blend of state-of-the-art technology and practical features, making it a preferred choice for those looking to invest in reliable and sustainable climate control solutions.