Chicago Electric 94338 manual Safety Setup Operation Maintenance, Parts List and Diagram

Page 11

Parts List and Diagram

 

Part

Description

Qty

1

Bottom enclosure

1

2

Top enclosure

1

3

Switch

1

4

Stator

1

5

Rotor

1

6

Rubber cylinder

4

7

Hold board

4

8

Brush holder

2

9

Carbon brush

2

10

Bearing 7x22x7

1

11

Bearing 9x26x8

1

12

Pin

1

13

Balance fan

1

14

Bottom board

1

15

Screw M5x8

1

4

 

 

 

 

 

 

 

 

 

 

 

1

 

 

 

 

 

 

 

 

 

9

 

 

 

 

 

7

 

8

2

6

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2723 24

25

26

Part Description

16Gasket

17Clamp wire

18Bearing 12x28x8

19Ring

20Gasket

21Screw M5x8

22Pad

23Cord anchorage

24Screw

25Cord guard

26Power cord and plug

27Label

28Screw ST4.2x20

29Dust bag

2 28

10

5

 

 

 

 

 

 

 

 

 

11

 

 

 

 

 

 

12

 

 

 

 

 

 

 

 

 

 

 

 

 

 

13

 

 

 

 

29

 

 

14

 

 

15

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

18

16

 

 

17

 

 

 

 

19

 

 

 

 

20

21

22

Qty

1

1

1

1

1

1

1

1

2

1

1

1

8

1

Safety

Setup

Operation

Maintenance

Record Product’s Serial Number Here:

Note: If product has no serial number, record month and year of purchase instead.

Note: Some parts are listed and shown for illustration purposes only, and are not available individually as replacement parts.

Item 94338

For technical questions, please call 1-800-444-3353.

Page 11

Image 11
Contents Page Work area safety Table of ContentsGeneral Power Tool Safety Warnings Setup Operation Maintenance Electrical safetyPersonal safety SafetyOperation Maintenan Safet SetuOperation Maintenance Vibration SafetySafety Setup Grounding Grounded Tools Tools with Three Prong PlugsDouble Insulated Tools Tools with Two Prong Plugs Safet Setu Operation Maintenan25´ 50´ 75´ 100´ 150´ SymbologyExtension Cords Safet Assembly Attaching the Dust BagSpecifications Setup Before UseGeneral Operating Instructions Tool Set UpWorkpiece and Work Area Set Up Attaching Sandpaper to the Backing PadProblem Possible Causes Likely Solutions Cleaning, Maintenance, and LubricationTroubleshooting Maintenance and ServicingPart Description Safety Setup Operation MaintenanceParts List and Diagram Part Description QtyPlease Read the Following Carefully Limited 90 Day Warranty