Q-Logic 9120 quick start Installation Tasks, Leaf

Page 5

Installation Tasks

NOTE: Before performing the installation tasks, take a few minutes to review the figures below. It is important to understand the slot numbering for the leaf modules and spine modules (and the corresponding spine RJ-45 ports). It is also important to understand the slot numbering for the fans and power supplies (and the corresponding AC power inlets for the power supplies).

Figure 1. SilverStorm 9120 Chassis Front View

Fan

Spine 3 (Unmanaged)

 

Fan

 

 

 

 

 

4

 

Spine 2 (Managed)

 

3

 

 

 

 

 

 

Spine 1 (Managed)

 

 

Fan

 

 

PS

PS

PS

Fan

2 PS

PS

PS

1

6

5

4

3

2

1

 

Figure 2. SilverStorm 9120 Chassis Back View

Leaf 11

Leaf 12

Leaf 9

Leaf 10

Leaf 7

Leaf 8

Leaf 5

Leaf 6

Leaf 3

Leaf 4

Leaf 1

Leaf 2

 

 

 

AC power inlet for power

 

 

AC power inlet for power

supplies 1 to 3

 

 

supplies 4 to 6

 

 

 

 

RJ-45 for Spine 1

RJ-45 for Spine 2

3

Image 5
Contents Quick Start Guide Support.qlogic.com SilverStorm Quick Start Guide Pre-Installation ChecklistRelease Notes Leaf Installation TasksChanging the IP Address and Default Gateway System prompts for a password. At the prompt enter To change the switch default gateway IP address enterSet OOB LAN IP Window To to exit the CLI enterPlace the Documentation CD in the CD-ROM drive Installing Documentation from a CDPage Standards applied Declaration of ConformityPage Page D000010-002 Rev. a