Panasonic Ey6803-U1 specifications Trial Operation after checking Troubleshooting Guide

Page 10

EY6803-U1

5TRIAL OPERATION (after checking TROUBLESHOOTING GUIDE.)

5.1.HAMMER/DRILL

Confirm the action when setting the H/D handle to HAMMER mode.

Rotation with hammering when the drill bit touches something like stone, and power.

It is OK, if it takes about 4-6 seconds by 20kgf to hole ( 6X30) on the concrete .

Confirm the action when setting the H/D handle to DRILL mode.

No hammering when the drill bit touches iron plate.

5.2.SWITCH

<SPEED CONTROL>

Change the rotation speed from 0-1000 rpm in proportion to the amount of pushing level on switch trigger.

<LED>

Check if the LED is lits.

5.3.REVERSING LEVER

Confirm the action with setting the reversing lever to FORWARD or REVERSE.

5.4.ASSEMBLY

Confirm pressing the lead wires between ribs, tightening screws firmly.

10

Image 10
Contents EY6803-U1 Schematic Diagram Wiring Connection Diagram DISASSEMBLY/ASSEMBLY Instructions Ref. No a Procedure 1A Removal of the chuck handleRef. No a Procedure 1A →1B →2A Removal of the switch HOW to Disassemble the Driving Block Vise in order to take out the bearing Troubleshooting Guide Check Points for Mechanism Block EY6803-U1 Trial Operation after checking Troubleshooting Guide Exploded View Replacement Parts List =only available as set *C=available individually