Assembly
1.Screw rubber handles (A, Fig. 1) onto handle shaft (B, Fig. 1). Screw handle shaft into downfeed hub (C, Fig. 1) and tighten. Flat spot on shaft accommodates a combination or adjustable wrench. Note: Handle shafts are already installed into hub on
2.Repeat for other two shaft assemblies.
3.Slide crank (D, Fig. 2) onto shaft and tighten set screw (E, Fig. 2). Be sure set screw seats on flat part of shaft.
4.Thread handle (F, Fig. 2) into crank and tighten.
5.Slide handwheel (G, Fig. 3) onto table handwheel shaft and tighten set screw. Insert handle (H, Fig. 3) into handwheel and tighten.
6.Repeat for two remaining table hand wheels.
Installation
WARNING
Machine isheavy! Use an appropriate
lifting device and use extreme caution when
moving the machine to its final location. Failure to comply may cause serious injury!
1. The location for the mill/drill should be well lit, dry, and have room enough to allow the head to rotate 360°.
2. Open the belt cover and thread the lifting hook into the head. There is a threaded hole found between the column and the spindle pulley.
3. Carefully lift the mill/drill with properly rated equipment to a sturdy stand or work bench. For best performance, through bolt the mill/drill to a bench or stand.
4. Remove the lifting hook.
5. Before bolting the mill/drill to a bench or stand, the unit must be level in both directions. Place a level on the table in both directions.
6. If the table is not level, shim under the low corner(s) until level. Tighten the fastening
bolts. Check for level again. Adjust as necessary until the mill/drill is level after the fastening hardware has been tightened.
7