Sega Zombie Revenge manual Coin Selector, Coin Meter Gate Cradle

Page 24

7 . COIN SELECTOR

HANDLING THE COIN JAM

If the coin is not rejected when the REJECT BUTTON is pressed, open the coin chute door and open the selector gate. After removing the jammed coin, put a normal coin in and check to see that the selector correctly functions.

CLEANING THE COIN SELECTOR

The coin selector should be cleaned once every 3 months. When cleaning, follow the procedure below:

1Turn the power for the machine OFF. Open the coin chute door.

2Open the gate and dust off by using a soft brush (made of wool, etc.).

3Remove and cleen smears by using a soft cloth dipped in water or diluted chemical detergent and then squeezed dry.

4Remove the CRADLE.

When removing the retaining ring(E- ring), be very careful so as not to bend the shaft.

5Remove stain from the shaft and pillow portions by wiping off with a soft cloth, etc.

6After wiping as per #5 above, further apply a dry cloth, etc. to cause the coin selector to dry completely.

Never apply machine oil, etc. to the coin selector

After cleaning the Coin Selecting, Insert a regular coin in the normal working status and ensure that the Selector correctly functions.

COIN INSERTION TEST

Once a month, when performing the COIN SW TEST, simultaneously check the following:

Does the Coin Meter count satisfactorily?

Does the coin drop into the Cashbox correctly? Is the coin rejected when inserted while keeping the REJECT BUTTON is pressed down?

Insert a coin while keeping the Reject Button pressed down and check if it is rejected.

COIN METER

GATE

FIG. 11a

CRADLE

FIG.11b

FIG. 11c

21

Image 24
Contents 1ST Printing March Warranty Table of Contents Sega ENTERPRISES, INC. USA General Precautions Listed Precautions to be Heeded for Operation Precautions to be Heeded During OperationWhen Assembled Name of PartsAccessories Filter BoardAssembling and Installation Assy of CabinetSecuring in Place Adjuster Adjustment Power Supply Assycheck VengeCRT Test Precations to be Heeded When Moving the Machine Explanation of Test and Data Display Items DescriptionSwitch Unit and Coin Meter Sound VolumeService Button Service SW Switch UnitCoin Chute Type Input Test Violence Mode Exit Select with Service Button Press Test Button to ExitSelection of Desired Item Stick Setting Adjusting the Volume ValueBookkeeping Back UP Data Clear 2/2 displays by-play-time play frequencyCoin Selector Coin Meter Gate CradleOptional Dollar Bill Acceptor Page Monitor Primary side and secondary sidePage Page Replacement of Fluorescent Lamp Replacement of Fluorescent LampPower Supply Plug Cleaning Cabinet SurfacesPeriodic Inspection Table Coin Chute TowerTroubleshooting Problems Cause CountermeasuresGame Board 12 -1 Removing the Game BoardNaomi Game BD Assy Case NAO USA 840-0003D-01 Zombie USA DIP SW Settings 12 -2 Composition of Game BoardDesign Related Parts Parts List TOP Assy ZBXAssy Monitor 29TYPE 31K See Description Assy Control Panel ZBXAC Unit Assy SUB Cabi ZBX LEG Adjuster Bolt M16X75 Not Available Assy SUB-CABINET ZBXAIR Vent See Description Assy Elec BaseAssy Billboard Marquee PlexLocal Purchase FL Ballast 20W FL Bulb 20W Assy Control Panel Control Panel Plate ZBX NAOPB SW W/L 6V 1L Y Assy Analog JOY 4C GreenSW Unit TNG LKGBOX-CASH Cash BOX Hole CoverSwitch Brkt Assy SW Unit SPG5-0350SW PB 1M VOL Cont B-5K OHMAssy AC Unit DRT1-0400 AC BrktBushing Strain Relief 6N34 Local Purchase Fuse 5AAssy Monitor 29TYPE 31K HOD1-1570 Monitor Brkt aMonitor Brkt B Bush for TVAudio Power AMP 2CH Not Available Wooden Base ElecLocal Purchase Fuse Block W/ Fuses PWR SpplyAssy Shield Case NAO ZBX 840-0003D-01 Shield Case ZBX NAO USAROM Case NAO Come see Sega ENTERPRISES’ Service Department Homepage