HP SN6000B, SN3000B manual Verify switch operation, Set switch features

Page 8

2.Connect the Fibre Channel cables from the switch to your host and storage devices. Ensure that the physical connections match the connections on the Device Connection screen.

a.Remove the plastic protector caps from the Fibre Channel cable ends (if there are any), and position the cable connector so that it is oriented correctly.

b.Position a cable so that the key (the ridge on one side of the cable connector) is aligned with the slot in the transceiver (see

Figure 9 (page 7)).

c.Insert the cable into the transceiver until the latching mechanism clicks.

d.The Device Connection screen shows missing, valid, and invalid connections as you cable the switch. It can take up to 15 seconds for the screen to display the connection as valid. Verify that the connections display green and then click Next.

Verify switch operation

1.Check the LEDs to verify that all components are functional. For information about LED patterns, see the HP B-series 16Gb Switches Hardware Reference Guide.

2.Verify the correct operation of the switch by issuing the switchShow command.

This command provides information about switch and port status.

3.Verify the correct operation of the fabric by issuing the fabricShow command.

This command provides general information about the fabric.

4.Back up the switch configuration to an FTP server by issuing the configUpload command and following the prompts.

This command uploads the switch configuration to the server, making it available for downloading to a replacement switch if necessary.

Set switch features

This completes the initial setup of your HP SN6000B or SN3000B 16Gb FC Switch. See the HP StorageWorks Fabric OS 7.0.x Administrator's Guide and the Fabric OS 7.0.x Command Reference Manual for detailed instructions on setting all supported switch features.

Page 8

Image 8
Contents Verify the SN6000B 16Gb 48-port FC switch carton contents OverviewVerify the SN3000B 16Gb 24-port FC switch carton contents Attaching the inner rails to the switch Attaching the outer rails Install a standalone switch Power on the switchSwitch setup Connect the serial cableSet the date and time Log in to the serial console portSet a static IP address Switchadmin tsclockserver ntp1ntp2 Inserting a 16 Gb/s SFP+ transceiver in a Fibre Channel portVerify switch operation Set switch features