Sterling A0552321 specifications Shipping Information

Page 2

Shipping Information

Unpacking and Inspection

You should inspect your equipment for possible shipping damage. Thoroughly check the equipment for any damage that might have occurred in transit, such as broken or loose wiring and components, loose hardware and mounting screws, etc.

In the Event of Shipping Damage

According to the contract terms and conditions of the Carrier, the responsibility of the Shipper ends at the time and place of shipment.

Notify the transportation company’s local agent if you discover damage

Hold the damaged goods and packing material for the examining agent’s inspection. Do not

return any goods before the transportation company’s inspection and authorization.

File a claim with the transportation company. Substantiate the claim by referring to the agent’s report. A certified copy of our invoice is available upon request. The original Bill of Lading is attached to our original invoice. If the shipment was prepaid, write us for a receipted transportation bill.

Advise customer service regarding your wish for assistance and to obtain an RMA (return material authorization) number.

If the Shipment is Not Complete

Check the packing list as back-ordered items are noted on the packing list. In addition to the equipment itself, you should have:

;Bill of lading

;Packing list

;Operating and Installation packet

;Electrical schematic and panel layout drawings

;Component instruction manuals (if applicable)

Re-inspect the container and packing material to see if you missed any smaller items during unpacking.

If the Shipment is Not Correct

If the shipment is not what you ordered, contact the parts and service department immediately at (262) 641-8610. Have the order number and item number available. Hold the items until you receive shipping instructions.

Returns

Do not return any damaged or incorrect items until you receive shipping instructions from the shipping department.

Pump Tanks

ii

Image 2
Contents Cooling Tower Water Chilled Water Pump Tanks Shipping Information Table of Contents Drawings and Specifications Safety Symbols Used in this Manual SafetyHow to Use This Manual Responsibility General Description Functional DescriptionModels Covered in This Manual Standard Features Optional Features Uncrating Your Pump Tank InstallationInstallation Location Considerations RiggingMaking Electrical Connections Installing Separate Tank Ledge ModelsInstalling Optional Equipment Making Piping Connections Pipe Sizing Guide Tower Tank Piping Connections Initial Start-up Chilled Water Piping ConnectionsDetermining Flow Rate OperationStart-up Single Stand-by pump Stand-by Pump UsageShut-down Dual Stand-By PumpWater Treatment MaintenancePreventative Maintenance Lubricating Pump Motors and SealsSterling, Inc Th Street New Berlin, WI AppendixTechnical Assistance Nema Panel Options Nema Panel Standard FeaturesRemote Starters and Nema Panels Drawings and Specifications Cooling Tower Water Pump TanksStandard Pumps and Trim Based on Cooling Tower Capacities Chilled Water Pump Tanks Standard Pumps and Trim Based on Chiller Capacities Process Pump Curves and Specifications P1 Process Pump Curves 60 CycleRe-circulation Pump Curves and Specifications P2 Recirculating Pump Curves 60 CycleSpare Process Pump Seals and Casing Gaskets Parts ListRecommended Spare Parts Spare Re-circulating Pump Seals and Casing GasketsOptional Assembly Detail Drawings Tank Support Leg Assembly Detail 4 LegsTank Support Leg Assembly Detail 6 Legs Tank Support Leg Assembly Detail 7 Legs Tank Ladder Assembly Detail Sightglass Assembly Detail Typical Piping Diagrams Cooling towerTypical Dual Well Cooling Tower Pump Tank Piping System Typical Single Well Chilled Water Pump Tank Piping System Typical Dual Well Chilled Water Pump Tank Piping System

A0552321 specifications

The Sterling A0552321 represents a remarkable advancement in the realm of contemporary machinery, designed to meet the evolving demands of various industries. This versatile equipment is engineered for efficiency and high performance, making it an invaluable asset to any operational setup.

One of the standout features of the Sterling A0552321 is its robust construction. Built with high-quality materials, this machine ensures durability and longevity, even under strenuous working conditions. The frame is reinforced to withstand significant stress, making it suitable for heavy-duty applications. This resilience translates into lower maintenance costs and extended operational life, providing excellent value for investment.

In terms of technology, the Sterling A0552321 integrates cutting-edge automation systems that enhance productivity. It boasts an advanced control panel featuring user-friendly interfaces, allowing operators to easily adjust settings and monitor performance metrics in real-time. The smart technology integrated into the Sterling A0552321 promotes seamless operation, minimizing human error and maximizing efficiency.

Another significant characteristic is its versatility. The Sterling A0552321 can be configured for multiple tasks, making it adaptable to various industry needs. Whether it’s manufacturing, construction, or logistics, this machine can be tailored to meet specific requirements, enhancing operational flexibility.

The performance of the Sterling A0552321 is noteworthy, equipped with a powerful engine that provides remarkable torque and speed. This capability ensures that it can handle challenging tasks with ease, significantly reducing operational downtime. Coupled with its energy-efficient design, the Sterling A0552321 helps businesses lower their energy consumption and environmental footprint.

Furthermore, safety is a top priority in the design of the Sterling A0552321. It incorporates comprehensive safety features, including emergency stop functions, protective guards, and sensor systems that enhance operational safety. Operators can work with confidence, knowing they are supported by technologically advanced safety measures.

In summary, the Sterling A0552321 stands out as a leader in modern machinery with its robust construction, advanced technology, versatility, high performance, and commitment to safety. It is designed for businesses that aim to optimize operations and increase productivity while providing exceptional value over time. Investing in the Sterling A0552321 is not just about acquiring a machine; it's about enhancing the overall efficiency and effectiveness of business operations.